Dataset Viewer
Auto-converted to Parquet
Requirement_ID
stringlengths
6
6
Content
stringlengths
63
279
Header
stringlengths
8
20
Qualification_Method
stringclasses
4 values
Artifact_Type
stringclasses
2 values
System_Requirement_State
stringclasses
1 value
Assignee
stringclasses
3 values
Review_Comment
float64
Primary_Discipline
stringclasses
2 values
Requirement_Type
stringclasses
2 values
System_Elements
stringclasses
3 values
ASIL_Rating
stringclasses
1 value
Cybersecurity
bool
2 classes
Key_Requirement
bool
1 class
Legal_Certification_Requirement
bool
2 classes
Variant
stringclasses
1 value
Verification_Method
stringclasses
2 values
Verification_Owner
stringclasses
3 values
Req001
TCU shall turn ON when driver turn ON KL30 & KL15, and TCU shall turn OFF when driver turn OFF KL30 or KL15.
Clamp control
TCU or Modem supplier is responsible for providing the test result to Brand for approval
System Requirement
Approved
ABC
null
HW-SW
System
Clamp control
A
false
true
null
XYZ_Model_2025
H/W Integration
Modem Funcational team
Req002
TCU shall start searching for corresponding eNodeB cells when KL30 & KL15 is ON
Network selection
TCU or Momdem Connectivity team supplier is responsible for providing the test result to Brand for approval
System Requirement
Approved
XYZ
null
HW-SW
System
Clamp control
A
false
true
null
XYZ_Model_2025
H/W Integration
Modem Funcational team
Req003
TCU shall operate on default bootstrap profile when the device is roaming it in the home country
Network selection
Connectivity team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
XYZ
null
SW
Functional
Connectivity
A
true
true
true
XYZ_Model_2025
SIT
Connecitivity Team
Req004
TCU should perform network registration to the primary MNO based on the current profile on the eSIM
Network selection
Connectivity team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
XYZ
null
SW
Functional
Connectivity
A
true
true
true
XYZ_Model_2025
SIT
Connecitivity Team
Req005
TCU should attached to it primary network based on MCC/MNC combination of it IMSI
Network selection
Connectivity team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
XYZ
null
SW
Functional
Connectivity
A
true
true
true
XYZ_Model_2025
SIT
Connecitivity Team
Req006
TCU shall perform Operation profile download when the device is roaming in the foreign country also depending on the OEM and MNO contracts.
Network selection
Connectivity team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
XYZ
null
SW
Functional
Connectivity
A
true
true
true
XYZ_Model_2025
SIT
Connecitivity Team
Req007
TCU shall start searching for corresponding eNodeB cells when KL30 & KL15 is ON
Network selection
TCU or Momdem Connectivity team supplier is responsible for providing the test result to Brand for approval
System Requirement
Approved
XYZ
null
HW-SW
System
Clamp control
A
false
true
null
XYZ_Model_2025
H/W Integration
Modem Funcational team
Req008
TCU shall operate on default bootstrap profile when the device is roaming it in the home country
Network selection
Connectivity team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
XYZ
null
SW
Functional
Connectivity
A
true
true
true
XYZ_Model_2025
SIT
Connecitivity Team
Req009
TCU should perform network registration to the primary MNO based on the current profile on the eSIM
Network selection
Connectivity team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
XYZ
null
SW
Functional
Connectivity
A
true
true
true
XYZ_Model_2025
SIT
Connecitivity Team
Req010
TCU should attached to it primary network based on MCC/MNC combination of it IMSI
Network selection
Connectivity team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
XYZ
null
SW
Functional
Connectivity
A
true
true
true
XYZ_Model_2025
SIT
Connecitivity Team
Req011
TCU shall perform Operation profile download when the device is roaming in the foreign country also depending on the OEM and MNO contracts.
Network selection
Connectivity team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
XYZ
null
SW
Functional
Connectivity
A
true
true
true
XYZ_Model_2025
SIT
Connecitivity Team
Req012
TCU shall send a PDN Connection to the network to register APNs
Network registration
Connectivity team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
XYZ
null
SW
Functional
Connectivity
A
true
true
true
XYZ_Model_2025
SIT
Connecitivity Team
Req013
TCU shall be VoLTE capable when registered to LTE or higher RATs if IMS registration is successful.
Network registration
Connectivity team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
XYZ
null
SW
Functional
Connectivity
A
true
true
true
XYZ_Model_2025
SIT
Connecitivity Team
Req014
TCU may be configured with eCall only mode based on the vehicle configuration i.e. TCU perform network registration when eCall is triggered
TCU configuration
Connectivity team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
XYZ
null
SW
Functional
Connectivity
A
true
true
true
XYZ_Model_2025
SIT
Connecitivity Team
Req015
TCU shall receive corrrect GPS location information i.e. correct latitude and longitute from the GNSS driver
TCU configuration
Connectivity team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
XYZ
null
HW-SW
Functional
Connectivity
A
true
true
true
XYZ_Model_2025
SIT
Connecitivity Team
Req016
TCU or vehicle shall be equippied with eCall service regardless of whether or not a vehicle owner opts for a TPS eCall service
TCU configuration
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req017
TCU shall receive eCall dataset from eCall Application which initially is received once TCU is online and registered to its OEM server.
eCall configuration
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
false
XYZ_Model_2025
SIT
eCall Funcational Team
Req018
TCU shall receive eCall dataset from eCall Application via vehicle disgnostics based on the regional requirements.
eCall configuration
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
false
XYZ_Model_2025
SIT
eCall Funcational Team
Req019
Offline regions or Ecall only regions shall have different ecall number, refer to the MNO configuration table
eCall configuration
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
false
XYZ_Model_2025
SIT
eCall Funcational Team
Req020
ECall dataset shall include the type of ecall i.e. TPS or EU Ecall; Ecall Numbers, T9 & T10 timers.
eCall configuration
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
false
XYZ_Model_2025
SIT
eCall Funcational Team
Req021
TCU shall be able to trigger manual EU eCall or Private Ecall when TCU is registered in any RAT i.e. GMS/UMTS/LTE/5G-NSA/5G-SA.
eCall configuration
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
HW-SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req022
TCU shall be able to trigger TPS (Private ECall)/EU eCall automatically when Airbags are initated when unit is registered in any RAT i.e. GMS/UMTS/LTE/5G-NSA/5G-SA.
eCall configuration
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
HW-SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req023
TCU shall be able to trigger manual TPS (Third Part Service or Private ECall) eCall when TCU is registered in any RAT i.e. GMS/UMTS/LTE/5G-NSA/5G-SA.
eCall configuration
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
HW-SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req024
TCU shall be cable to trigger automatic TPS (Third Part Service or Private ECall) eCall when TCU is registered in any RAT i.e. GMS/UMTS/LTE/5G-NSA/5G-SA.
eCall configuration
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
HW-SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req025
TCU shall be able to trigger manual TPS (Third Part Service) eCall when TCU is registered in VoLTE in case of Private Ecall.
eCall configuration
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
HW-SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req026
TCU shall be cable to trigger automatic TPS (Third Part Service) eCall when TCU is registered in VoLTE in case of Private Ecall.
eCall configuration
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
HW-SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req027
TCU shall be perform CSFB when EU ecall is triggered in LTE or higher RATs.
eCall configuration
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req028
Two-way voice communication shall be established between the IVS (In-Vehicle System) and the PSAP in case of EU Ecall.
MO eCall
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req029
Two-way voice communication shall be established between the IVS (In-Vehicle System) and TSP (Third Part Service) in case Private ECall.
MO eCall
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req030
The quality of voice communication shall be verified by validation team in all RATs in case of MO call.
MO eCall
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req031
TCU should be able to receive a clear-down eCall request from the PSAP or hang-up the eCall.
MT eCall
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req032
TCU shall receive a call-back from the PSAP in case of EU Ecall.
MT eCall
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req033
TCU shall receive a call-back from the PSAP in case of Private ECall.
MT eCall
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req043
The quality of voice communication shall be verified by validation team in all RATs in case of MT call.
MT eCall
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req034
TCU shall send MSD (Minimum Set Data) via SMS when an eCall is triggered in all RATs
MSD Transmission
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req035
TCU shall send MSD (Minimum Set Data) via SMS and SIP when an TPS eCall is triggered in LTE or higher RATs.
MSD Transmission
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req036
MSD data tranmistted via SMS or SIP shall contain VIN, color of the vehicle, GPS Location (latitute/Longitute), total number of Passengers in Vehicle
MSD Transmission
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req037
MSD data shall indicate if the activation type of the ecall i.e Manual eCall or Automatic eCall or Test Call
MSD Transmission
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req038
TCU Unit shall received a MSD retransmission request from the PSAP or TPS to update MSD information. This requirement should be applicable for initial eCall trigger and call-back from PSAP/TSP.
MSD Transmission
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req039
TCU shall enter the wait callback state when initial eCall session is ended in case of accident or passenger in the vehicle cannot reach the agent.
Callback eCall
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req040
TCU shall perform automatic redials if the initial call set-up attempt fails due to busy, network congestion or PSAP out-of-service.
Redials scenario
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req041
TCU shall perform automatic redials if the initial call set-up attempt fails due no answer. This can be verified with audio monitor that vehicle received "ring-back tone". In this case automatic redials attempts should be completed within 2 miutes as defined in ETSI EN 16072 [5]
Redials scenario
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req042
Two-way voice communication shall be established between IVS (In-Vehicle System) and the PSAP or TSP after MSD retranmission. This requirement should be applicable for initial eCall trigger and call-back from PSAP/TSP.
eCall Generic
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req043
TCU shall have only one active eCall service at a time i.e. either TSP or EU ecall is activate and other is deactivated.
eCall Generic
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req044
TCU shall fallback to EU ecall when TSP is not functional or the TSP cannot be reached due to unavailablitiy of the service in that region or market.
eCall Generic
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req045
eCall only mode: TCU shall perform mobile network registration only when the eCall is triggered.
eCall only
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team
Req046
In case of eCall only mode MO eCall shall be as Req032 other MSD tranmission shall be as Req023 and MT eCall shall be as Req031
eCall only
eCall team supplier is responsible for providing the test result to Brand for approval
Functional Requirement
Approved
PQRS
null
SW
Functional
eCall
A
true
true
true
XYZ_Model_2025
SIT
eCall Funcational Team

Dataset Card for autoReq

Importing dataset into Python environment

Use the following code chunk to import the dataset into a Python environment as a DataFrame.

Downloads last month
76