hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
4
595
content
stringlengths
0
6.67M
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.1 General
The performance requirements for the UE in this clause is specified for the measurement channels specified in annex C and the propagation conditions specified in annex D. Unless otherwise stated the receiver characteristics are specified at the antenna connector of the UE. For UE(s) with an integral antenna only, a reference antenna with a gain of 0 dBi is assumed. UE with an integral antenna may be taken into account by converting these power levels into field strength requirements, assuming a 0 dBi gain antenna. For UEs with more than one receiver antenna connector the fading of the signals and the AWGN signals applied to each receiver antenna connector shall be uncorrelated. The levels of the test signal applied to each of the antenna connectors shall be as defined in the respective sections below. Table 12.1: Summary of UE performance targets Test Chs. Information Data Rate Performance metric Static Multi-path Case 1 Multi-path Case 3 DCH 12.2 kbps BLER<10-2 BLER<10-2 BLER<10-2 64 kbps BLER<10-1 BLER<10-1 BLER<10-1 All Block Error ratio (BLER) measurements in clause 12 shall be performed according to the general rules for statistical testing in Annex F.6.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.1.2 Definition of Additive White Gaussian Noise (AWGN) Interferer
The minimum bandwidth of the AWGN interferer shall be 1.5 times chip rate of the radio access mode. (e.g. 5.76 MHz for a chip rate of 3,84 Mcps). The flatness across this minimum bandwidth shall be less than 0.5 dB and the peak to average ratio at a probability of 0.001% shall exceed 10 dB.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2 Demodulation of DCH in static propagation conditions
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.1 Definition and applicability
The performance requirement of DCH in static propagation conditions is determined by the maximum Block Error Ratio (BLER ). The BLER is specified for each individual data rate of the DCH. DCH is mapped into the Dedicated Physical Channel (DPCH). The requirements and this test apply to all types of 1.28 Mcps TDD UE of Release 11 and later.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.2 Minimum requirements
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.2.1 3.84 Mcps TDD Option
[FFS]
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.2.2 1.28 Mcps TDD Option
For the parameters specified in Table 12.2.2.2a and and Table 12.2.2.2b the BLER should not exceed the piece-wise linear BLER curve specified in Table 12.2.2.2c. The reference for this requirement is TS 25.102 [1] clause 12.2.1.2. Table 12.2.2.2a: DCH parameters in static propagation conditions (12.2 kbps) Parameters Unit Test 1 Test 2 Test 3 Number of DPCHo 4 12 28 Scrambling code and basic midamble code number of SS#1* 19 19 19 Scrambling code and basic midamble code number of SS#2* 58 58 58 Scrambling code and basic midamble code number of SS#3* 85 85 85 DPCH Channelization Codes of SS#1* C(k,Q) C(i,16) i=1,2 C(i,16) i=1,2 C(i,16) i=1,2 DPCHo Channelization Codes of SS#2* C(k,Q) C(i,16) 1≤ i ≤2 C(i,16) 1≤ i ≤6 C(i,16) 1≤ i ≤14 DPCHo Channelization Codes of SS#3* C(k,Q) C(i,16) 1≤ i ≤2 C(i,16) 1≤ i ≤6 C(i,16) 1≤ i ≤14 of SS#2 dB 10 5 0 of SS#3 dB 4 -1 -6 SFN-SFN Observed Timing Difference Type 2 between SS#1 and SS#2 chip 0 0 0 SFN-SFN Observed Timing Difference Type 2 between SS#1 and SS#3 chip 0 0 0 Power of SS#2** dBm -67 -67.22 -68.54 Power of SS#3** dBm -73 -73.22 -74.54 Ioc dBm/1,28MHz -80 Midamble Default midamble (Kcell = 8) *Note: Refer to TS 25.223 for definition of channelization codes, scrambling code and basic midamble code. **Note: Power of SS can be calculated from and Ioc. Table 12.2.2.2b: DCH parameters in static propagation conditions (64 kbps) Parameters Unit Test 4 Test 5 Test 6 Number of DPCHo 4 12 28 Scrambling code and basic midamble code number of SS#1* 19 19 19 Scrambling code and basic midamble code number of SS#2* 58 58 58 Scrambling code and basic midamble code number of SS#3* 85 85 85 DPCH Channelization Codes of SS#1* C(k,Q) C(i,16) 1≤ i ≤8 C(i,16) 1≤ i ≤8 C(i,16) 1≤ i ≤8 DPCHo Channelization Codes of SS#2* C(k,Q) C(i,16) 1≤ i ≤2 C(i,16) 1≤ i ≤6 C(i,16) 1≤ i ≤14 DPCHo Channelization Codes of SS#3* C(k,Q) C(i,16) 1≤ i ≤2 C(i,16) 1≤ i ≤6 C(i,16) 1≤ i ≤14 of SS#2 dB 10 5 0 of SS#3 dB 4 -1 -6 SFN-SFN Observed Timing Difference Type 2 between SS#1 and SS#2 chip 0 0 0 SFN-SFN Observed Timing Difference Type 2 between SS#1 and SS#3 chip 0 0 0 Power of SS#2** dBm -67 -67.22 -68.54 Power of SS#3** dBm -73 -73.22 -74.54 Ioc dBm/1,28MHz -80 Midamble Default midamble (Kcell = 8) *Note: Refer to TS 25.223 for definition of channelization codes, scrambling code and basic midamble code. **Note: Power of SS can be calculated from and Ioc. Table 12.2.2.2c: Minimum requirements in static propagation conditions Test Number [dB] BLER 1 -0.3 10-2 2 2.8 10-2 3 8.7 10-2 4 4.1 10-1 5 10.7 10-1 6 12.9 10-1
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.2.3 7.68 Mcps TDD Option
[FFS]
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.3 Test purpose
The test purpose is to verify the ability of the receiver to receive a predefined test signal ,representing a static propagation channel for the wanted and for the co-channel signals from serving and adjacent cells, with a block error ratio (BLER) not exceeding a specified value.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.4 Method of test
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect the SS, AWGN Generator and additional components to the UE antenna connector as shown in figure A.19. 2) A call is set up according to the Generic call setup procedure. The characteristic of the call shall be according to the DL reference measurement channels (12,2 kbit/s) or (64 kbit/s) specified in annex C for 1.28Mcps TDD option. 3) Enter the UE into loopback test mode and start the loopback test. (test 1) and/or activate the Ack/Nack test mode. 4) The levels of the wanted signal and the co-channel signals are set according to Table 12.2.2.2a, Table 12.2.2.2b and Table 12.2.2.2c for the 1,28 Mcps TDD Option.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.4.2 Procedure
Measure the BLER of DCH received from the UE at the SS for all tests specified in Table 12.2.2.2a and Table 12.2.2.2b for 1,28 Mcps TDD Option.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.5 Test requirements
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.5.1 3.84Mcps TDD Option
[FFS]
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.5.2 1.28Mcps TDD Option
The measured BLER shall not exceed the values indicated in table 12.2.5.2 for 1.28 Mcps TDD Option. Table 12.2.5.2: Performance requirements in static propagation conditions Test Number [dB] BLER 1 0.3 10-2 2 3.4 10-2 3 9.3 10-2 4 4.7 10-1 5 11.3 10-1 6 13.5 10-1 NOTE: If the Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.2.5.3 7.68Mcps TDD Option
[FFS]
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3 Demodulation of DCH in Multipath fading Case 1 conditions
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.1 Definition and applicability
The performance requirement of DCH in Multipath fading Case 1 conditions is determined by the maximum Block Error Ratio (BLER). The BLER is specified for each individual data rate of the DCH. DCH is mapped into the Dedicated Physical Channel (DPCH). The requirements and this test apply to all types of 1.28 Mcps TDD UE of Release 11 and later.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.2 Minimum requirements
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.2.1 3.84 Mcps TDD Option
[FFS]
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.2.2 1.28 Mcps TDD Option
For the parameters specified in Table 12.3.2.2a and and Table 12.3.2.2b the BLER should not exceed the piece-wise linear BLER curve specified in Table 12.3.2.2c. The reference for this requirement is TS 25.102 [1] clause 12.3.1.2. Table 12.3.2.2a: DCH parameters in Multipath fading Case 1 conditions (12.2 kbps) Parameters Unit Test 1 Test 2 Test 3 Number of DPCHo 4 12 28 Scrambling code and basic midamble code number of SS#1* 19 19 19 Scrambling code and basic midamble code number of SS#2* 58 58 58 Scrambling code and basic midamble code number of SS#3* 85 85 85 DPCH Channelization Codes of SS#1* C(k,Q) C(i,16) i=1,2 C(i,16) i=1,2 C(i,16) i=1,2 DPCHo Channelization Codes of SS#2* C(k,Q) C(i,16) 1≤ i ≤2 C(i,16) 1≤ i ≤6 C(i,16) 1≤ i ≤14 DPCHo Channelization Codes of SS#3* C(k,Q) C(i,16) 1≤ i ≤2 C(i,16) 1≤ i ≤6 C(i,16) 1≤ i ≤14 of SS#2 dB 10 5 0 of SS#3 dB 4 -1 -6 SFN-SFN Observed Timing Difference Type 2 between SS#1 and SS#2 chip 0 0 0 SFN-SFN Observed Timing Difference Type 2 between SS#1 and SS#3 chip 0 0 0 Power of SS#2** dBm -67 -67.22 -68.54 Power of SS#3** dBm -73 -73.22 -74.54 Ioc dBm/1,28MHz -80 Midamble Default midamble (Kcell = 8) *Note: Refer to TS 25.223 for definition of channelization codes, scrambling code and basic midamble code. **Note: Power of SS can be calculated from and Ioc. Table 12.3.2.2b: DCH parameters in Multipath fading Case 1 conditions (64 kbps) Parameters Unit Test 4 Test 5 Test 6 Number of DPCHo 4 12 28 Scrambling code and basic midamble code number of SS#1* 19 19 19 Scrambling code and basic midamble code number of SS#2* 58 58 58 Scrambling code and basic midamble code number of SS#3* 85 85 85 DPCH Channelization Codes of SS#1* C(k,Q) C(i,16) 1≤ i ≤8 C(i,16) 1≤ i ≤8 C(i,16) 1≤ i ≤8 DPCHo Channelization Codes of SS#2* C(k,Q) C(i,16) 1≤ i ≤2 C(i,16) 1≤ i ≤6 C(i,16) 1≤ i ≤14 DPCHo Channelization Codes of SS#3* C(k,Q) C(i,16) 1≤ i ≤2 C(i,16) 1≤ i ≤6 C(i,16) 1≤ i ≤14 of SS#2 dB 10 5 0 of SS#3 dB 4 -1 -6 SFN-SFN Observed Timing Difference Type 2 between SS#1 and SS#2 chip 0 0 0 SFN-SFN Observed Timing Difference Type 2 between SS#1 and SS#3 chip 0 0 0 Power of SS#2** dBm -67 -67.22 -68.54 Power of SS#3** dBm -73 -73.22 -74.54 Ioc dBm/1,28MHz -80 Midamble Default midamble (Kcell = 8) *Note: Refer to TS 25.223 for definition of channelization codes, scrambling code and basic midamble code. **Note: Power of SS can be calculated from and Ioc. Table 12.3.2.2c: Performance requirements in Multipath fading Case 1 conditions Test Number [dB] BLER 1 11.8 10-2 2 15.2 10-2 3 19.5 10-2 4 13.3 10-1 5 18.4 10-1 6 21.1 10-1
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.2.3 7.68 Mcps TDD Option
[FFS]
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.3 Test purpose
The test purpose is to verify the ability of the receiver to receive a predefined test signal ,representing a static propagation channel for the wanted and for the co-channel signals from serving and adjacent cells, with a block error ratio (BLER) not exceeding a specified value.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.4 Method of test
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect the SS, the fading simulator, AWGN Generator and additional components to the UE antenna connector as shown in figure A.20. 2) A call is set up according to the Generic call setup procedure. The characteristic of the call shall be according to the DL reference measurement channels (12,2 kbit/s) or (64 kbit/s) specified in annex C for 1.28Mcps TDD option. 3) Enter the UE into loopback test mode and start the loopback test. (test 1) and/or activate the Ack/Nack test mode. 4) The levels of the wanted signal and the co-channel signals are set according to Table 12.3.2.2a, Table 12.3.2.2b and Table 12.3.2.2c for the 1,28 Mcps TDD Option.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.4.2 Procedure
Measure the BLER of DCH received from the UE at the SS for all tests specified in Table 12.3.2.2a and Table 12.3.2.2b for 1,28 Mcps TDD Option.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.5 Test requirements
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.5.1 3.84Mcps TDD Option
[FFS]
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.5.2 1.28Mcps TDD Option
The measured BLER shall not exceed the values indicated in table 12.3.5.2 for 1.28 Mcps TDD Option. Table 12.3.5.2: Performance requirements in static propagation conditions Test Number [dB] BLER 1 13.0 10-2 2 16.4 10-2 3 20.7 10-2 4 14.5 10-1 5 19.6 10-1 6 22.3 10-1 NOTE: If the Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.3.5.3 7.68Mcps TDD Option
[FFS]
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4 Demodulation of DCH in Multipath fading Case 3 conditions
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.1 Definition and applicability
The performance requirement of DCH in Multipath fading Case 3 conditions is determined by the maximum Block Error Ratio (BLER). The BLER is specified for each individual data rate of the DCH. DCH is mapped into the Dedicated Physical Channel (DPCH). The requirements and this test apply to all types of 1.28 Mcps TDD UE of Release 11 and later.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.2 Minimum requirements
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.2.1 3.84 Mcps TDD Option
[FFS]
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.2.2 1.28 Mcps TDD Option
For the parameters specified in Table 12.4.2.2a and and Table 12.4.2.2b the BLER should not exceed the piece-wise linear BLER curve specified in Table 12.4.2.2c. The reference for this requirement is TS 25.102 [1] clause 12.4.1.2. Table 12.4.2.2a: DCH parameters in Multipath fading Case 3 conditions (12.2 kbps) Parameters Unit Test 1 Test 2 Test 3 Number of DPCHo 4 12 28 Scrambling code and basic midamble code number of SS#1* 19 19 19 Scrambling code and basic midamble code number of SS#2* 58 58 58 Scrambling code and basic midamble code number of SS#3* 85 85 85 DPCH Channelization Codes of SS#1* C(k,Q) C(i,16) i=1,2 C(i,16) i=1,2 C(i,16) i=1,2 DPCHo Channelization Codes of SS#2* C(k,Q) C(i,16) 1≤ i ≤2 C(i,16) 1≤ i ≤6 C(i,16) 1≤ i ≤14 DPCHo Channelization Codes of SS#3* C(k,Q) C(i,16) 1≤ i ≤2 C(i,16) 1≤ i ≤6 C(i,16) 1≤ i ≤14 of SS#2 dB 10 5 0 of SS#3 dB 4 -1 -6 SFN-SFN Observed Timing Difference Type 2 between SS#1 and SS#2 chip 0 0 0 SFN-SFN Observed Timing Difference Type 2 between SS#1 and SS#3 chip 0 0 0 Power of SS#2** dBm -67 -67.22 -68.54 Power of SS#3** dBm -73 -73.22 -74.54 Ioc dBm/1,28MHz -80 Midamble Default midamble (Kcell = 8) *Note: Refer to TS 25.223 for definition of channelization codes, scrambling code and basic midamble code. **Note: Power of SS can be calculated from and Ioc. Table 12.4.2.2b: DCH parameters in Multipath fading Case 3 conditions (64 kbps) Parameters Unit Test 4 Test 5 Test 6 Number of DPCHo 4 12 28 Scrambling code and basic midamble code number of SS#1* 19 19 19 Scrambling code and basic midamble code number of SS#2* 58 58 58 Scrambling code and basic midamble code number of SS#3* 85 85 85 DPCH Channelization Codes of SS#1* C(k,Q) C(i,16) 1≤ i ≤8 C(i,16) 1≤ i ≤8 C(i,16) 1≤ i ≤8 DPCHo Channelization Codes of SS#2* C(k,Q) C(i,16) 1≤ i ≤2 C(i,16) 1≤ i ≤6 C(i,16) 1≤ i ≤14 DPCHo Channelization Codes of SS#3* C(k,Q) C(i,16) 1≤ i ≤2 C(i,16) 1≤ i ≤6 C(i,16) 1≤ i ≤14 of SS#2 dB 10 5 0 of SS#3 dB 4 -1 -6 SFN-SFN Observed Timing Difference Type 2 between SS#1 and SS#2 chip 0 0 0 SFN-SFN Observed Timing Difference Type 2 between SS#1 and SS#3 chip 0 0 0 Power of SS#2** dBm -67 -67.22 -68.54 Power of SS#3** dBm -73 -73.22 -74.54 Ioc dBm/1,28MHz -80 Midamble Default midamble (Kcell = 8) *Note: Refer to TS 25.223 for definition of channelization codes, scrambling code and basic midamble code. **Note: Power of SS can be calculated from and Ioc. Table 12.4.2.2c: Performance requirements in Multipath fading Case 3 conditions Test Number [dB] BLER 1 6.5 10-2 2 8.8 10-2 3 11.6 10-2 4 10.9 10-1 5 14.3 10-1 6 17.0 10-1
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.2.3 7.68 Mcps TDD Option
[FFS]
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.3 Test purpose
The test purpose is to verify the ability of the receiver to receive a predefined test signal ,representing a static propagation channel for the wanted and for the co-channel signals from serving and adjacent cells, with a block error ratio (BLER) not exceeding a specified value.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.4 Method of test
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect the SS, the fading simulator, AWGN Generator and additional components to the UE antenna connector as shown in figure A.20. 2) A call is set up according to the Generic call setup procedure. The characteristic of the call shall be according to the DL reference measurement channels (12,2 kbit/s) or (64 kbit/s) specified in annex C for 1.28Mcps TDD option. 3) Enter the UE into loopback test mode and start the loopback test. (test 1) and/or activate the Ack/Nack test mode. 4) The levels of the wanted signal and the co-channel signals are set according to Table 12.4.2.2a, Table 12.4.2.2b and Table 12.4.2.2c for the 1,28 Mcps TDD Option.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.4.2 Procedure
Measure the BLER of DCH received from the UE at the SS for all tests specified in Table 12.4.2.2a and Table 12.4.2.2b for 1,28 Mcps TDD Option.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.5 Test requirements
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.5.1 3.84Mcps TDD Option
[FFS]
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.5.2 1.28Mcps TDD Option
The measured BLER shall not exceed the values indicated in table 12.4.5.2 for 1.28 Mcps TDD Option. Table 12.4.5.2: Performance requirements in static propagation conditions Test Number [dB] BLER 1 7.7 10-2 2 10.0 10-2 3 12.8 10-2 4 12.1 10-1 5 15.5 10-1 6 18.2 10-1 NOTE: If the Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero.
40bd05ebf1e9d686c3dc55dd3e817398
34.122
12.4.5.3 7.68Mcps TDD Option
[FFS]
852c5999d703da168048fd5b505d5d2d
30.820
1 Scope
The present document contains the up-to-date SA5 Work Item Descriptions (WIDs) and captures the status of all SA5 work items in the current Release. This TR is used as a mean to provide input to the 3GPP work plan handled by MCC. Status list of Work items can be found in Annex A of the present document.
852c5999d703da168048fd5b505d5d2d
30.820
2 References
The following documents contain provisions which, through reference in this text, constitute provisions of the present document. • References are either specific (identified by date of publication, edition number, version number, etc.) or non‑specific. • For a specific reference, subsequent revisions do not apply. • For a non-specific reference, the latest version applies. In the case of a reference to a 3GPP document (including a GSM document), a non-specific reference implicitly refers to the latest version of that document in the same Release as the present document. [1] http://www.3gpp.org/ftp/Information/WORK_PLAN/ [2] http://www.3gpp.org/ftp/Information/WI_Sheet/ TSG SA Meeting #46 SP-090761 07 - 10 December 2009, Sanya, China
852c5999d703da168048fd5b505d5d2d
30.820
3 Local IP Access and Selected Internet IP Traffic Offload UID_450035
TSG SA Meeting #51 SP-110131 21 - 23 Mar 2011, Kansas City, USA 3GPP TSG-SA5 (Telecom Management) S5-111532 SA5#76, 28 Feb - 4 Mar 2011, San Diego, USA revision of S5-111079 3GPP TSG-SA5 (Telecom Management) MCC merger of S5-094347 and S5-0904339 Meeting SA5#68, 9 Nov-13 Nov 2009, Shanghai, China TSG SA Meeting #45 SP-090618 21 - 24 September 2009, Seville, Spain 3GPP TSG SA WG2 Meeting #75 TD S2-096108 31 August – 4 September, 2009, Kyoto, Japan
852c5999d703da168048fd5b505d5d2d
30.820
3.1 OAM&P for LIPA_SIPTO UID_450040
Clauses 3.1 and 3.2 share the same SA-wide WI description reported in 3.2.
852c5999d703da168048fd5b505d5d2d
30.820
3.2 Charging for LIPA_SIPTO UID_460039
Local IP Access and Selected IP Traffic Offload UID_LIPA_SIPTO
852c5999d703da168048fd5b505d5d2d
30.820
1 3GPP Work Area *
Radio Access X Core Network Services
852c5999d703da168048fd5b505d5d2d
30.820
2 Classification of WI and linked work items
852c5999d703da168048fd5b505d5d2d
30.820
2.0 Primary classification *
This work item is a … * Study Item (go to 2.1) Feature (go to 2.2) X Building Block (go to 2.3) Work Task (go to 2.4)
852c5999d703da168048fd5b505d5d2d
30.820
2.1 Study Item
Related Work Item(s) (if any] Unique ID Title Nature of relationship Go to §3.
852c5999d703da168048fd5b505d5d2d
30.820
2.2 Feature
Related Study Item or Feature (if any) * Unique ID Title Nature of relationship Go to §3.
852c5999d703da168048fd5b505d5d2d
30.820
2.3 Building Block
Parent Feature (or Study Item) Unique ID Title TS 410030 Network Improvements for Machine-Type Communications - This work item is … * Stage 1 (go to 2.3.1) Stage 2 (go to 2.3.2) X Stage 3 (go to 2.3.3) Test spec (go to 2.3.4) Other (go to 2.3.5) 2.3.3 Stage 3 * Corresponding stage 2 work item (if any) Unique ID Title TS 490037 Stage 2 for Network Improvements for Machine-Type Communications 23.060, 23.236, 23.401
852c5999d703da168048fd5b505d5d2d
30.820
3 Justification *
Excerpt from TR 22.868 on Machine-to-Machine communications: “It appears that there is market potential for M2M beyond the current "premium M2M market segment" i.e. the market segments that are currently using M2M. In particular it is possible to identify potential applications for mass M2M service, e.g. consumer products manufacturers could keep in touch with their products after they are shipped – car manufacturers could serve as an example for that. Another example is in the home environment where remote maintenance of heating and air condition, alarm systems and other applications can also be identified.” The study on Machine-to-Machine communications indicated the potential for machine-type communications over mobile networks. However, for example wireless sensor networks (e.g. Zigbee) in combination with fixed network communications are also a contender for the implementation of such applications. For mobile networks to be competitive for mass machine-type applications, it is important to optimise their support for machine-type communications. The current mobile networks are optimally designed for Human-to-Human communications, but are less optimal for machine-to-machine, machine-to-human, or human-to-machine applications. It is also important to enable network operators to offer machine-type communication services at a low cost level, to match the expectations of mass-market machine-type services and applications.
852c5999d703da168048fd5b505d5d2d
30.820
4 Objective *
The objective is to enhance existing PS/EPS charging with Machine-Type Communications (MTC) information in alignment to the Rel-10 stage 2 description for MTC service support. Only Charging requirements specified in stage 1 TS 22.368 shall be addressed in this work item.
852c5999d703da168048fd5b505d5d2d
30.820
5 Service Aspects
Covered by the parent Feature
852c5999d703da168048fd5b505d5d2d
30.820
6 MMI-Aspects
Covered by the parent Feature
852c5999d703da168048fd5b505d5d2d
30.820
7 Charging Aspects
This is a Charging Work Item
852c5999d703da168048fd5b505d5d2d
30.820
8 Security Aspects
Covered by the parent Feature
852c5999d703da168048fd5b505d5d2d
30.820
9 Impacts *
Affects: UICC apps ME AN CN Others Yes X No X X X X Don't know
852c5999d703da168048fd5b505d5d2d
30.820
10 Expected Output and Time scale *
New specifications * [If Study Item, one TR is anticipated] Spec No. Title Prime rsp. WG 2ndary rsp. WG(s) Presented for information at plenary# Approved at plenary# Comments Affected existing specifications * [None in the case of Study Items] Spec No. CR Subject Approved at plenary# Comments 32.251 MTC charging enhancements SA#51 Mar 2011 Charging Data Record (CDR) parameter description 32.298 CDR enhancements for MTC SA#51 Mar 2011 Packet Switched (PS) domain charging 32.299 Diameter charging application enhancements for MTC SA#51 Mar 2011 Diameter charging applications 11 Work item rapporteur(s) * Patrik Teppo (patrik teppo at ericsson dot com) 12 Work item leadership * SA5 13 Supporting Individual Members * Supporting IM name Alcatel-Lucent AT&T Ericsson Huawei Nokia Siemens Networks Orange Vodafone ZTE Annex A: Status of SA5 Work Items This list reflects work items moved, ongoing, completed or stopped. 510040 Charging for Network Improvements for Machine-Type Communication NIMTC-CH 450035 Local IP Access and Selected Internet IP Traffic Offload LIPA_SIPTO 450040 OAM&P for Local IP Access and Selected Internet IP Traffic Offload LIPA_SIPTO 460039 Charging for Local IP Access and Selected Internet IP Traffic Offload LIPA_SIPTO 450041 IP Flow Mobility and seamless WLAN offload IFOM 470021 Charging for IP Flow Mobility and seamless WLAN offload IFOM 460028 Optimal Media Routing OMR 500013 Charging for Optimal Media Routing OMR 460031 Rel-10 Operations, Administration, Maintenance and Provisioning (OAM&P) OAM10 460032 Network Infrastructure Management OAM10-NIM 460033 Common RAT Network Resource Model (NRM) RAT_NRM_common 470035 IRP Solution Set specification organisation improvements OAM-IRP-SS 470036 Deleted - Service Oriented Architecture (SOA) for IRP continuation from Rel-9 OAM-SOA-IRP 480042 IRP Overview, Profiles & Usage Guide OAM-NIM-IRP_OPU 510041 Alarm Correlation and Root Cause Analysis OAM-AC-RCA 510042 Inventory Management Network Resource Model enhancements OAM-IM-NMR 460034 Self-Organizing Networks (SON) - OAM aspects OAM10-SON 460035 SON Self-optimization management continuation LTE-SON-OAM_SO 460036 SON Self-healing management LTE-SON-OAM_SH 470037 OAM aspects of Energy Saving in Radio Networks OAM-ES 470038 Subscription Management (SuM) evolution OAM10-SuM 470039 Performance Management OAM10-PM 470040 Key Performance Indicators (KPIs) for IMS OAM-PM-KPI_IMS 470041 Key Performance Indicators (KPIs) for EPC OAM-PM-KPI_EPC 470042 Management of UE based network performance measurements OAM-PM-UE 470142 Management of UE based network performance measurements OAM-PM-UE 470043 3G HNB and LTE HeNB Subsystem performance measurements OAM-PM-HeNS 470044 Rel-10 Charging Management small Enhancements CH10 440063 IWLAN mobility charging eIWLAN_Mob 470046 Advice of Charge (AoC) service support enhancements eAoC 470047 SA5 part - AoC enhancements eAoC 410044 Study on Rc Reference Point Functionalities and Message Flows FS_OAM_Rc 430044 Study on Telecommunication Management; Energy Savings Management FS_OAM_ESM 440069 Study on Integration of Device Management Information with Itf-N FS_IDMI_Itf-N 460037 Study on Alignment of 3GPP Generic NRM IRP and TMF Shared Information Data (SID) model FS_3GNRM_TMFSID 460038 Study on Harmonization of 3GPP Alarm IRP and TMF Interface Program (TIP) Fault Management FS_3G_TMF_FM 480045 Study on Alarm Correlation and Alarm Root Cause Analysis FS_AC_ARCA 480046 Study on Alignment of 3GPP PM IRP and TMF Interface Program (TIP) PM FS_3G_TMF_PM 440050 Deleted - Study on EPC Charging enhancement FS_EPCcharg Annex B: Change history Change history Date TSG # TSG Doc. CR Rev Subject/Comment Old New Sep 2011 SP-53 SP-110516 -- -- Presentation to SA for information and approval --- 1.0.0 Sep 2011 -- -- -- -- Publication 1.0.0 10.0.0
852c5999d703da168048fd5b505d5d2d
30.820
4 IP Flow Mobility and seamless WLAN offload UID_450041
Technical Specification Group Services and System Aspects TSGS#47(10)0089 Meeting #47; Vienna, Austria; 22-25 March 2010 3GPP TSG-SA5 (Telecom Management) S5-101018 Meeting SA5#70, 01 - 05 Mar 2010, Xiamen, China 3GPP TSG-SA5 (Telecom Management) S5-100484 Meeting SA5#69, 18 - 22 Jan 2010, Valencia, Spain revision of S5-100190 TSG SA Meeting #46 SP-090804 07 - 10 December 2009, Sanya, China Title: Updated Feature WID: IP Flow Mobility and seamless WLAN offload Source: SA WG2 Agenda Item: 11.10 TSG SA WG2 Meeting #76 S2-097477 16-20 November, 2009, San Jose del Cabo, Mexico This is a proposed update of the IFOM WID to: • add that system description for non-seamless WLAN offload will be specified in TS 23.402. • update the reference and title of the new TS created by this work • add more supporting companies. 3GPP™ Work Item Description For guidance, see 3GPP Working Procedures, article 39; and 3GPP TR 21.900.
852c5999d703da168048fd5b505d5d2d
30.820
4.1 Charging for IFOM UID_470021
852c5999d703da168048fd5b505d5d2d
30.820
5.1 Network Infrastructure Management UID_460032
Technical Specification Group Services and System Aspects TSGS#48(10)0293 Meeting #48; Seoul, Republic of Korea; 07-10 June 2010 3GPP TSG-SA5 (Telecom Management) S5-101530 Meeting SA5#71, 10-14 May 2010, Montreal, Canada revision of SP-090758 TSG SA Meeting #46 SP-090758 07 - 10 December 2009, Sanya, China
852c5999d703da168048fd5b505d5d2d
30.820
5.1.1 Common RAT Network Resource Model (NRM) - RAT_NRM_common – UID_460033
852c5999d703da168048fd5b505d5d2d
30.820
5.1.2 IRP Solution Set Specification Organisation Improvements (OAM-IRP-SS) UID_470035
852c5999d703da168048fd5b505d5d2d
30.820
5.1.3 Service Oriented Architecture (SOA) for IRP; continuation (OAM-SOA-IRP) UID_470036
Technical Specification Group Services and System Aspects TSGS#47(10)0076 Meeting #47; Vienna, Austria; 22-25 March 2010 3GPP TSG-SA5 (Telecom Management) S5-100890 Meeting SA5#70, 1-5 March 2010, Xiamen, China revision of S5-100603
852c5999d703da168048fd5b505d5d2d
30.820
5.1.4 IRP Overview, Profiles & Usage Guide (OAM-NIM-IRP_OPU) UID_ 480042
3GPP TSG SA Meeting #52 SP-110277 Bratislava, Slovakia, 06 – 08 June, 2011 3GPP TSG-SA5 (Telecom Management) S5-112084 SA5#77, 09 May – 13 May 2011; Shenzhen, China revision of SP-100777 TSG SA Meeting #50 SP-100777 13-15 Dec 2010, Istanbul, Turkey Technical Specification Group Services and System Aspects TSGS#48(10)0388 Meeting #48; Seoul, Republic of Korea; 07-10 June 2010 3GPP TSG-SA5 (Telecom Management) S5-101421 Meeting SA5#71, 10-14 May 2010, Montreal, CANADA revision of S5-101400
852c5999d703da168048fd5b505d5d2d
30.820
5.1.5 Alarm correlation and root cause analysis (OAM-AC-RCA) UID_510041
TSG SA Meeting #51 SP-110137 21 - 23 Mar 2011, Kansas City, USA 3GPP TSG-SA5 (Telecom Management) S5-111498 SA5#76, 28 Feb - 4 Mar 2011; San Diego, USA revision of S5-111(198,343)
852c5999d703da168048fd5b505d5d2d
30.820
5.1.6 Inventory Management Network Resource Model enhancements (OAM-IM-NMR) UID_510042
TSG SA Meeting #51 SP-110141 21 - 23 Mar 2011, Kansas City, USA 3GPP TSG-SA5 (Telecom Management) S5-111493 SA5#76, 28 Feb - 4 Mar 2011; San Diego, USA revision of S5-111346
852c5999d703da168048fd5b505d5d2d
30.820
5.2 Self-Organizing Networks OAM aspecsts (OAM-10-SON) UID_ 460034
TSG SA Meeting #51 SP-110130 21 - 23 Mar 2011, Kansas City, USA 3GPP TSG-SA5 (Telecom Management) S5-111414 SA5#76, 28 Feb - 4 Mar 2011; San Diego, USA revision of S5-111088 TSG SA Meeting #51 SP-110130 21 - 23 Mar 2011, Kansas City, USA 3GPP TSG-SA5 (Telecom Management) S5-111414 SA5#76, 28 Feb - 4 Mar 2011; San Diego, USA revision of S5-111088 TSG SA Meeting #46 SP-090756 07 - 10 December 2009, Sanya, China 3GPP TSG-SA5 (Telecom Management) S5-094092 Meeting SA5#68 09-13 Nov 2009, Shanghai, China
852c5999d703da168048fd5b505d5d2d
30.820
5.2.1 SON self-optimization management continuation - LTE-SON-OAM-SO UID_460035
852c5999d703da168048fd5b505d5d2d
30.820
5.2.2 SON self-healing management (LTE-SON-OAM-SH) UID_460036
TSG SA Meeting #51 SP-110150 21 - 23 Mar 2011, Kansas City, USA 3GPP TSG-SA5 (Telecom Management) S5-111524 SA5#76, 28 Feb - 4 Mar 2011; San Diego, USA revision of SP-100776 TSG SA Meeting #50 SP-100776 13-15 Dec 2010, Istanbul, Turkey 3GPP TSG-SA5 (Telecom Management) S5-103369 SA5#74-OAM , 15 - 19 Nov 2010; Jacksonville, USA revision of S5-10abcd TSG SA Meeting #46 SP-090757 07 - 10 December 2009, Sanya, China 3GPP TSG-SA5 (Telecom Management) S5-094354 Meeting SA5#68 09-13 Nov 2009, Shanghai, China
852c5999d703da168048fd5b505d5d2d
30.820
11 Work item rapporteur(s) *
852c5999d703da168048fd5b505d5d2d
30.820
12 Work item leadership *
SA5
852c5999d703da168048fd5b505d5d2d
30.820
13 Supporting Individual Members *
Supporting IM name ZTE Vodafone China Mobile Nokia Siemens Networks Huawei Technologies. Motorola T-Mobile Orange Telecom Italia Telefonica TeliaSonera China Telecom
852c5999d703da168048fd5b505d5d2d
30.820
5.2.3 OAM aspects of Energy Saving in Radio Networks (OAM10-ES) UID_470037
TSG SA Meeting #51 SP-110128 21 - 23 Mar 2011, Kansas City, USA 3GPP TSG-SA5 (Telecom Management) S5-110533 SA5#75, 24 - 28 Jan 2011; Sorrento, ITALY revision of SP-110226 Technical Specification Group Services and System Aspects TSGS#47(10)0226 Meeting #47; Vienna, Austria; 22-25 March 2010 revision of SP-100077 3GPP TSG-SA5 (Telecom Management) S5-100891 Meeting SA5#70, March 01-05 2010, Xiamen, China revision of S5-10693 Source: Nokia Siemens Networks, Vodafone, Huawei, NEC Corporation Title: New WID on OAM aspects of Energy Saving in Radio Networks
852c5999d703da168048fd5b505d5d2d
30.820
5.3 Subscription Management (SuM) evolution OAM10-SuM UID_470038
Technical Specification Group Services and System Aspects TSGS#47(10)0086 Meeting #47; Vienna, Austria; 22-25 March 2010 3GPP TSG-SA5 (Telecom Management) S5-100709 Meeting SA5#70, 01-05 March 2010, Xiamen, P.R.China Source: Ericsson, Verizon Wireless, Alcatel-Lucent, Nokia Siemens Networks Title: New WID on Subscription Management (SuM) evolution Document for: Approval Agenda Item: 6.02 New OAM Work Item proposals
852c5999d703da168048fd5b505d5d2d
30.820
1 3GPP Work Area
X Radio Access X Core Network Services
852c5999d703da168048fd5b505d5d2d
30.820
2.0 Primary classification
This work item is a … X Study Item (go to 2.1) Feature (go to 2.2) Building Block (go to 2.3) Work Task (go to 2.4)
852c5999d703da168048fd5b505d5d2d
30.820
4 Objective
The objective of this technical work is to study automated energy savings management features. Usage of existing IRPs is expected as much as possible, e.g. Configuration Management IRP, etc. However, this technical work may identify the need for defining a new IRP. The following operations may be considered in this study item (but not necessarily limited to): Retrieval of energy consumption measurements Retrieval of traffic load measurements Adjust Network Resources capabilities Note that SA5 is willing to work in cooperation with RAN WGs that define e.g. eNodeB energy savings control mechanisms.
852c5999d703da168048fd5b505d5d2d
30.820
5.4 Performance Management (OAM10-PM) UID_470039
Technical Specification Group Services and System Aspects TSGS#47(10)0083 Meeting #47; Vienna, Austria; 22-25 March 2010 3GPP TSG-SA5 (Telecom Management) S5- 100340 Meeting SA5#69, 18 - 22 Jan 2010, Valencia, Spain revision of S5-10xyzw 3GPP™ Work Item Description For guidance, see 3GPP Working Procedures, article 39; and 3GPP TR 21.900.
852c5999d703da168048fd5b505d5d2d
30.820
5.4.1 Key Performance Indicators (KPIs) for IMS (OAM-PM-KPI_IMS) UID_470040
852c5999d703da168048fd5b505d5d2d
30.820
3 Justification
Sustainable development is a long-term commitment in which all of us should take part. As part of sustainable development, our fight against global warming should be without respite. Our activities have a limited impact on environment: in 2007, the total footprint of the ICT sector was about 2% of the estimated total emissions from human activity and telecoms are only a part of ICT which represents no more than 25% of these 2%. Nevertheless, most mobile network operators aim at reducing their greenhouse emissions, by several means such as limiting their networks' energy consumption. In new generation Radio Access Networks such as LTE, Energy Savings Management function takes place especially when mobile network operators want e.g. to reduce Tx power, switch off/on cell, etc. based on measurements made in the network having shown that there is no need to maintain active the full set of NE capabilities. By initiating this Work Item about Energy Savings Management, we hope to contribute to the protection of our environment and the environment of future generations.
852c5999d703da168048fd5b505d5d2d
30.820
5.4.2 Key Performance Indicators (KPIs) for EPC (OAM-PM-KPI_EPC) UID_470041
852c5999d703da168048fd5b505d5d2d
30.820
5.4.3 Management of UE based network performance measurements (OAM-PM-UE) UID_470042
852c5999d703da168048fd5b505d5d2d
30.820
9 Impacts
Affects: UICC apps ME AN CN Others Yes X X No X X X Don't know
852c5999d703da168048fd5b505d5d2d
30.820
10 Expected Output and Time scale
New specifications [If Study Item, one TR is anticipated] Title Prime rsp. WG 2ndary rsp. WG(s) Presented for information at plenary# Approved at plenary# Comments TR 32.xx1 Study on Energy Savings Management -Concepts and Requirements SA5 SA#47 Mar 2010 SA#47 Mar 2010 The TR shall describe concepts and requirements for Energy Savings Management Affected existing specifications [None in the case of Study Items] Spec No. CR Subject Approved at plenary# Comments 11 Work item Rapporteur(s) Orange, Jean-Michel Cornilly; Vodafone 12 Work item leadership SA5 13 Supporting Individual Members Supporting IM name Alcatel-Lucent China Mobile Huawei Technologies Orange SA Telefonica T-Mobile Vodafone Technical Specification Group Services and System Aspects TSGS#47(10)0088 Meeting #47; Vienna, Austria; 22-25 March 2010 3GPP TSG-SA5 (Telecom Management) S5-101014 Meeting SA5#70, 01 - 05 Mar 2010, Xiamen, China TSG SA Meeting #44 SP-090462 01 - 04 June 2009, Oranjestad, Aruba 3GPP TSG-SA5 (Telecom Management) S5-092064 Meeting #64 March 30 - April 3, 2009, Hangzhou, CHINA Source: Motorola, Qualcomm Europe, Vodafone, T-Mobile, Telefonica, Telecom Italy, Orange Title: New SID on Study on User Equipment Management (UEM) Document for: Approval Agenda Item: 6.x 3GPP™ Work Item Description For guidance, see 3GPP Working Procedures, article 39; and 3GPP TR 21.900.
852c5999d703da168048fd5b505d5d2d
30.820
5.4.4 3G HNB and LTE HeNB Subsystem performance measurement (OAM-PM-HeNS) UID_470043
852c5999d703da168048fd5b505d5d2d
30.820
6 Charging Management small Enhancements (CH10) UID_470044
Technical Specification Group Services and System Aspects TSGS#47(10)0090 Meeting #47; Vienna, Austria; 22-25 March 2010 3GPP TSG-SA5 (Telecom Management) S5-101075 Meeting SA5#70, 1-5 Mar 2010, Xiamen, P.R. China revision of S5-100975 Source: Orange Title: WID Update: IWLAN Mobility charging Document for: Approval Agenda Item:
852c5999d703da168048fd5b505d5d2d
30.820
6.1 IWLAN mobility charging (IWLAN_Mob) UID_440063 Moved from Rel-9
852c5999d703da168048fd5b505d5d2d
30.820
6.2 Add solutions for Rc (reference point within OCS) (CH-Rc) UID_470045 Moved to Rel-11
852c5999d703da168048fd5b505d5d2d
30.820
7 Advice of Charge (AoC) service support enhancements (eAoC) UID_470046
Technical Specification Group Services and System Aspects TSGS#47(10)0080 Meeting #47; Vienna, Austria; 22-25 March 2010 3GPP TSG-SA5 (Telecom Management) S5-101030 Meeting SA5#70, 01 - 05 Mar 2010, Xiamen, China revision of S5-100905 Source: Deutsche Telekom Title: New WID proposal on Advice of Charge (AoC) service support enhancements Document for: Approval Agenda Item: 3GPP™ Work Item Description For guidance, see 3GPP Working Procedures, article 39; and 3GPP TR 21.900.
852c5999d703da168048fd5b505d5d2d
30.820
7.1 Advice of Charge (AoC) service support enhancements (eAoC) UID_470047
852c5999d703da168048fd5b505d5d2d
30.820
8 Feasibility studies
Technical Specification Group Services and System Aspects TSGS#41(08)0464 Meeting #41, 15 - 18 September 2008, Kobe, Japan Source: SA5 Title: New SID on Rc Reference Point Document for: Approval Agenda Item: 12.18 3GPP TSG-SA5 (Telecom Management) S5-081204 Meeting SA5#60, 7 - 11 Jul 2008, Sophia Antipolis, FRANCE Source: Huawei, China Mobile Title: New SID on Rc Reference Point Document for: Approval Agenda Item: Study Item Description
852c5999d703da168048fd5b505d5d2d
30.820
8.1 Study on Rc Reference Point Functionalities and Message Flows UID_410044 – Moved from Rel-9
Is this Work Item a "Study Item"? (Yes / No): Yes 1 3GPP Work Area Radio Access X Core Network Services 2 Linked work items Release 8 Small charging enhancements 3 Justification The purpose of this SID is to serve as a basis for detailed specification of OCS interfaces Rc in SA5. Under a comprehensive consideration of the status of OCS, it is proposed to start study of Rc reference point solution. It is therefore recommended to have a study item to guide further specification of the Rc reference point. 4 Objective This Study Item aims to have a study report and recommendation for Rc Reference Point. 5 Service Aspects None/Text 6 MMI-Aspects None/Text 7 Charging Aspects 8 Security Aspects None/Text
852c5999d703da168048fd5b505d5d2d
30.820
10 Expected Output and Time scale (to be updated at each plenary)
New specifications [If Study Item, one TR is anticipated] Spec No. Title Prime rsp. WG 2ndary rsp. WG(s) Presented for information at plenary# Approved at plenary# Comments 32.825 Telecommunication management; Charging management; Rc Reference Point Study SA5 SA#47 Mar 2010 SA#47 Mar 2010 Affected existing specifications [None in the case of Study Items] Spec No. CR Subject Approved at plenary# Comments 11 Work item rapporteur(s) Mingjun Shan, Huawei [[email protected]] 12 Work item leadership SA5 13 Supporting Companies Huawei, China Mobile, Orange, China Unicom, ZTE 14 Classification of the WI (if known) Study Item (no further information required) Feature (go to 14a) Building Block (go to 14b) X Work Task (go to 14c)
852c5999d703da168048fd5b505d5d2d
30.820
14a The WI is a Feature: List of building blocks under this feature
(list of Work Items identified as building blocks)