hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
4
595
content
stringlengths
0
6.67M
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.1.2 QoS Offered by Network is a lower QoS
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.1.2.1 QoS Accepted by MS
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.1.2.1.1 Conformance requirement
In order to request a PDP context activation, the MS sends an ACTIVATE PDP CONTEXT REQUEST message to the network. If the QoS offered by the network is acceptable to mobile, then upon receipt of the message ACTIVATE PDP CONTEXT ACCEPT the MS shall initiate establishment of the logical link with the offered QoS. Reference 3GPP TS 04.08 / 3GPP TS 24.008 subclause 6.1.3.1.1.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.1.2.1.2 Test purpose
To test the behaviour of the MS when the network responds to a PDP context activation request with a lower QoS than that requested.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.1.2.1.3 Method of test
Specific PICS statements: - PIXIT statements: - Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Test procedure The requested QoS and Minimum QoS are set. A context activation is requested by the user. On receipt of the ACTIVATE PDP CONTEXT REQUEST message a ACTIVATE PDP CONTEXT ACCEPT is returned by the SS with a QoS lower than the requested but higher than or equal to the minimum. The SS then sends a MODIFY PDP CONTEXT REQUEST message and the MS shall respond with a MODIFY PDP CONTEXT ACCEPT message to confirm the context is active. Maximum duration of test 5 minutes. Expected sequence Step Direction Message Comments 1 MS Initiate a context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP context activation 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept a PDP context activation 4 SS -> MS MODIFY PDP CONTEXT REQUEST Send a modify request for the activated context 5 MS -> SS MODIFY PDP CONTEXT ACCEPT Accept the modification request to show context is activated Specific message contents As default except: Activate PDP Context Request Information Element Value/remark Transaction identifier In the range 0-6 Transaction identifier flag 0 NSAPI In the range 5-15 Requested LLC SAPI 3, 5, 9 or 11 Requested QoS Arbitrarily chosen Activate PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Negotiated LLC SAPI As above Negotiated QoS At least one value lower than in above but higher than or equal to minimum Radio priority level Arbitrarily chosen Spare half octet 0 PDP address omitted Modify PDP Context Request Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Radio priority level As above Spare half octet 0 Requested LLC SAPI As above New QoS As above Modify PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 0
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.1.2.2 QoS Rejected by MS
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.1.2.2.1 Conformance requirement
In order to request a PDP context activation, the MS sends an ACTIVATE PDP CONTEXT REQUEST message to the network. Upon receipt of the message ACTIVATE PDP CONTEXT ACCEPT offering a QoS which is not acceptable to the mobile, the MS shall initiate the PDP context deactivation procedure. Reference 3GPP TS 04.08 / 3GPP TS 24.008 subclause 6.1.3.1.1.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.1.2.2.2 Test purpose
To test the behaviour of the MS when the QoS offered by the network in response to a PDP context activation request is not acceptable to the MS.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.1.2.2.3 Method of test
Specific PICS statements: - PIXIT statements: - Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Test procedure The requested QoS and Minimum QoS are set. A context activation is requested by the user. On receipt of the ACTIVATE PDP CONTEXT REQUEST message an ACTIVATE PDP CONTEXT ACCEPT message is returned by the SS with a QoS lower than the minimum. The MS shall then send a DEACTIVATE PDP CONTEXT REQUEST message. A DEACTIVATE PDP CONTEXT ACCEPT message will be sent in return by the SS. Maximum duration of test 5 minutes. Expected sequence Step Direction Message Comments 1 MS Initiate a context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP context activation 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context activation 4 MS -> SS DEACTIVATE PDP CONTEXT REQUEST Deactivate the PDP context 5 SS -> MS DEACTIVATE PDP CONTEXT ACCEPT Accept the PDP context deactivation Specific message contents As default except: Activate PDP Context Request Information Element Value/remark Transaction identifier In the range 0-6 Transaction identifier flag 0 NSAPI In the range 5-15 Requested LLC SAPI 3, 5, 9 or 11 Requested QoS Arbitrarily chosen Requested PDP address Arbitrarily chosen Activate PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Negotiated LLC SAPI As above Negotiated QoS At least one value lower than in above and lower than minimum Radio priority level Arbitrarily chosen Spare half octet 0 Deactivate PDP Context Request Information Element Value/remark Transaction identifier As above Transaction identifier flag 0 SM cause QoS not acceptable Deactivate PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 1
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.2 PDP context activation requested by the network, successful and unsuccessful
Applicability This test needs to take into account the number of contexts supported by the MS to be able to test the response when all contexts are activated and the network tries to initiate a new context.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.2.1 Conformance requirement
1) Upon receipt of a REQUEST PDP CONTEXT ACTIVATION message: - If the MS accepts the request the MS shall then initiate the PDP context activation procedure. - If the MS rejects the request, the MS shall send a REQUEST PDP CONTEXT ACTIVATION REJECT message with one of the following causes: - #26: insufficient resources; - #31: activation rejected, unspecified; - #40: feature not supported; or - #95 – 111: protocol errors. 2) The MS shall not ignore the request. 3) If the MS accepts the request, the ACTIVATE PDP CONTEXT REQUEST message sent by the MS shall contain the parameters requested by the network in the REQUEST PDP CONTEXT ACTIVATION message, except for the offered QoS which may be changed by the MS. 4) Whenever a REQUEST PDP CONTEXT ACTIVATION message is received by the MS specifying a transaction identifier relating to a PDP context not in state PDP-INACTIVE, the MS shall locally deactivate the old PDP context relating to the received transaction identifier. Furthermore, the MS shall continue with the activation procedure of a new PDP context as indicated in the received message. Reference 3GPP TS 04.08 / 3GPP TS 24.008 subclauses 6.1.3.1.2, 6.1.3.1.4 and 8.3.2 (f).
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.2.2 Test purpose
To test the behaviour of the MS upon receipt of a context activation request from the network.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.2.3 Method of test
Specific PICS statements: - PIXIT statements: - Number of network initiated PDP contexts supported Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Case 1 For an MS that supports PDP Context Activation requested by the network. Test procedure A REQUEST PDP CONTEXT ACTIVATION message is sent by the SS. On receipt of the ACTIVATE PDP CONTEXT REQUEST message an ACTIVATE PDP CONTEXT ACCEPT message is returned by the SS. This is repeated until the maximum number of contexts supported by the MS are activated. If the MS cannot support seven PDP contexts then one greater than the maximum supported by the MS should be requested. In response to this activation request the MS shall return a REQUEST PDP CONTEXT ACTIVATION REJECT message with cause set to 'insufficient resources', 'feature not supported', 'activation rejected, unspecified' or 'protocol errors' using cause values #26, #31, #40 or #95-#111. A REQUEST PDP CONTEXT ACTIVATION message is then sent using a currently activated context transaction identifier. The MS shall activate this context in place of the previous context. Maximum duration of test 5 minutes. Expected sequence Step Direction Message Comments 1 SS -> MS REQUEST PDP CONTEXT ACTIVATION Request a PDP context activation request 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP context activation 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context activation 4 SS Steps 1-3 are repeated for Min( number of Network Initiated contexts supported, 7 ) NOTE: If all 7 contexts are supported steps 5 and 6 should not be performed 5 SS -> MS REQUEST PDP CONTEXT ACTIVATION Request a PDP context activation request 6 MS -> SS REQUEST PDP CONTEXT ACTIVATION REJECT The context activation request is rejected with cause 'insufficient resources', 'feature not supported', 'activation rejected, unspecified' or 'protocol errors' using cause values #26, #31, #40 or #95-111. 7 SS -> MS REQUEST PDP CONTEXT ACTIVATION Request a PDP context activation request for an existing context 8 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP context activation to replace the existing context 9 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context activation Case 2 For an MS that does not support PDP Context Activation requested by the network. Test procedure A REQUEST PDP CONTEXT ACTIVATION message is sent by the SS. The MS shall then send an REQUEST PDP CONTEXT ACTIVATION REJECT message with cause set to 'insufficient resources' or 'feature not supported' or 'activation rejected, unspecified' or 'protocol errors'. Maximum duration of test 5 minutes. Expected sequence Step Direction Message Comments 1 SS -> MS REQUEST PDP CONTEXT ACTIVATION Request a PDP context activation request 2 MS -> SS REQUEST PDP CONTEXT ACTIVATION REJECT Reject the PDP context activation request with cause 'insufficient resources', 'feature not supported', 'activation rejected, unspecified' or 'protocol errors' using cause values #26, #31, #40 or #95-111. Specific message contents As default except: Request PDP Context Activation Information Element Value/remark Transaction identifier In the range 0-6 Transaction identifier flag 0 Offered PDP address Arbitrarily chosen Activate PDP Context Request Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 NSAPI In the range 5-15 Requested LLC SAPI 3, 5, 9 or 11 Requested QoS Arbitrarily chosen Requested PDP address As above Activate PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 0 Negotiated LLC SAPI As above Negotiated QoS As above Radio priority level Arbitrarily chosen Spare half octet 0 Request PDP Context Activation Reject Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 PDP address As above SM cause 'insufficient resources' or 'feature not supported' or 'activation rejected, unspecified' or 'protocol errors'
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.3 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4 Abnormal cases
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.1 T3380 Expiry
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.1.1 Conformance requirement
1) On the first expiry of the timer T3380, the MS shall resend the PDP CONTEXT ACTIVATION REQUEST. 2) On the second expiry of the timer T3380, the MS shall resend the PDP CONTEXT ACTIVATION REQUEST. 3) On the third expiry of the timer T3380, the MS shall resend the PDP CONTEXT ACTIVATION REQUEST. 4) On the fourth expiry of the timer T3380, the MS shall resend the PDP CONTEXT ACTIVATION REQUEST. 5) On the fifth expiry of the timer T3380, the MS shall release all resources possibly allocated for this invocation and shall abort the procedure; no automatic PDP context activation re-attempt shall be performed. Reference 3GPP TS 04.08 / 3GPP TS 24.008 subclause 6.1.3.1.5.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.1.2 Test purpose
To test the behaviour of the MS when the network does not reply to PDP CONTEXT ACTIVATION REQUEST
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.1.3 Method of test
Specific PICS statements: - PIXIT statements: - Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Test procedure A context activation is requested by the user. The MS shall send the ACTIVATE PDP CONTEXT REQUEST message five times with T3380 ±10 % seconds between each message. After this no further ACTIVATE PDP CONTEXT REQUEST messages shall be sent by the MS. Maximum duration of test 5 minutes. Expected sequence Step Direction Message Comments 1 MS Initiate a context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP context activation 3 SS T3380 ±10% seconds 4 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP context activation 5 SS T3380 ±10% seconds 6 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP context activation 7 SS T3380 ±10% seconds 8 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP context activation 9 SS T3380 ±10% seconds 10 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP context activation 11 SS Wait for T3380 +10% seconds to ensure no further ACTIVATE PDP CONTEXT REQUEST messages are sent by the MS Specific message contents As default except: Activate PDP Context Request Information Element Value/remark Transaction identifier In the range 0-6 Transaction identifier flag 0 NSAPI In the range 5-15 Requested LLC SAPI 3, 5, 9 or 11 Requested QoS Arbitrarily chosen Requested PDP address Arbitrarily chosen
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.2 Collision of MS initiated and network requested PDP context activation
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.2.1 Conformance requirement
In the event of collision between MS initiated and network initiated PDP context activation requests, the MS shall discard the REQUEST PDP CONTEXT ACTIVATION message and shall wait for an ACTIVATE PDP CONTEXT ACCEPT message. Reference 3GPP TS 04.08 / 3GPP TS 24.008 subclause 6.1.3.1.5.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.2.2 Test purpose
To test the behaviour of the MS when there is a collision between an MS initiated and network requested PDP context activation.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.2.3 Method of test
Specific PICS statements: - PIXIT statements: - Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Case 1 For an MS that supports PDP Context Activation requested by the network. Test procedure A context activation is requested by the user. After receipt of the ACTIVATE PDP CONTEXT REQUEST message the SS sends a REQUEST PDP CONTEXT ACTIVATION message followed by an ACTIVATE PDP CONTEXT ACCEPT message in a time less than T3380 (Use T3380/2). The MS shall send no messages within this time. Maximum duration of test 5 minutes. Expected sequence Step Direction Message Comments 1 MS Initiate a context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP context activation 3 SS -> MS REQUEST PDP CONTEXT ACTIVATION Request a PDP context activation request 4 SS Wait for T3380/2 seconds to ensure MS does not resend ACTIVATE PDP CONTEXT REQUEST 5 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context activation Case 2 For an MS that does not support PDP Context Activation requested by the network. Test procedure A context activation is requested by the user. After receipt of the ACTIVATE PDP CONTEXT REQUEST message the SS sends a REQUEST PDP CONTEXT ACTIVATION message. The MS shall send a REQUEST PDP CONTEXT ACTIVATION REJECT message with cause set to 'insufficient resources' or 'feature not supported' or 'activation rejected, unspecified' or 'protocol errors'. The SS then sends an ACTIVATE PDP CONTEXT ACCEPT. Maximum duration of test 5 minutes. Expected sequence Step Direction Message Comments 1 MS Initiate a context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP context activation 3 SS -> MS REQUEST PDP CONTEXT ACTIVATION Request a PDP context activation request 4 MS -> SS REQUEST PDP CONTEXT ACTIVATION REJECT The context activation request is rejected with cause 'insufficient resources', 'feature not supported', 'activation rejected, unspecified' or 'protocol errors' using cause values #26, #31, #40 or #95-111. 5 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context activation Specific message contents As default except: Activate PDP Context Request Information Element Value/remark Transaction identifier In the range 0-6 Transaction identifier flag 0 NSAPI In the range 5-15 Requested LLC SAPI 3, 5, 9 or 11 Requested QoS Arbitrarily chosen Requested PDP address Arbitrarily chosen APN Arbitrarily chosen Request PDP Context Activation Information Element Value/remark Transaction identifier In the range 0-6 Transaction identifier flag 0 Offered PDP address As requested by the MS APN As requested by the MS (Case 1) Different from requested by the MS (Case 2) Activate PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Negotiated LLC SAPI As above Negotiated QoS As above Radio priority level Arbitrarily chosen Spare half octet 0 Request PDP Context Activation Reject Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 SM cause 'insufficient resources' or 'feature not supported' or 'activation rejected, unspecified' or 'protocol errors'
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.3 Network initiated PDP context activation request for an already activated PDP context (on the MS side)
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.3.1 Definition
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.3.2 Conformance requirement
If the MS receives a REQUEST PDP CONTEXT ACTIVATION message with the same combination of APN, PDP type and PDP address as an already activated PDP context, the MS shall deactivate the existing PDP context and, if any, all the linked PDP contexts (matching the combination of APN, PDP type and PDP address) locally without notification to the network and proceed with the requested PDP context activation. Reference 3GPP TS 24.008 clause 6.1.3.1.5 d).
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.3.3 Test purpose
To test the behaviour of the MS when it detects a network initiated PDP context activation for the PDP context already activated on the MS side.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.3.4 Method of test
Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Specific PICS statements: - Network requested PDP context activation supported (TSPC_AddInfo_N_req_PDP_CA) PIXIT statements: - Test procedure A PDP context activation is requested by the user. SS accepts PDP context activation. Secondary PDP context activation is requested by the user. SS accepts secondary PDP context activation. SS sends a REQUEST PDP CONTEXT ACTIVATION message with the same combination of APN, PDP type and PDP address as an already activated PDP context. 2 cases are expected: Case A (MS supports “Network requested PDP context activation”): The MS deactivates the existing PDP context and linked secondary PDP context (matching the combination of APN, PDP type and PDP address) locally without notification to the SS and proceeds with the requested PDP context activation. Case B (MS does not support “Network requested PDP context activation”): The MS sends REQUEST PDP CONTEXT ACTIVATION REJECT message with cause set to 'insufficient resources' or 'feature not supported' or 'activation rejected, unspecified' or 'protocol errors' and the existing PDP contexts stay still active. Expected sequence Step Direction Message Comments 1 MS Initiate a context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST MS requests a PDP context activation 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT SS accepts the PDP context activation 4 MS -> SS ACTIVATE SECONDARY PDP CONTEXT REQUEST MS requests a secondary PDP context activation 5 SS -> MS ACTIVATE SECONDARY PDP CONTEXT ACCEPT SS accepts the secondary PDP context activation 6 SS -> MS REQUEST PDP CONTEXT ACTIVATION SS requests a PDP context activation with the same combination of APN, PDP type and PDP address as the activated PDP context If the MS supports “Network requested PDP context activation” branch A is performed, otherwise branch B is performed. 7A MS MS locally deactivates the activated PDP context and the secondary PDP context 8A MS -> SS ACTIVATE PDP CONTEXT REQUEST MS replies with a Request PDP context activation 9A SS -> MS ACTIVATE PDP CONTEXT ACCEPT SS accepts the PDP context activation 10A SS -> MS MODIFY PDP CONTEXT REQUEST Request the modification of the secondary PDP context 11A MS -> SS SM STATUS Cause set to #81. This verifies that the secondary PDP context was locally deactivated. 12A SS -> MS MODIFY PDP CONTEXT REQUEST Request the modification of the first PDP context 13A MS -> SS SM STATUS Cause set to #81. This verifies that the first PDP context was locally deactivated. 7B MS -> SS REQUEST PDP CONTEXT ACTIVATION REJECT The context activation request is rejected with cause 'insufficient resources', 'feature not supported', 'activation rejected, unspecified' or 'protocol errors' using cause values #26, #31, #40 or #95-111. 8B SS -> MS MODIFY PDP CONTEXT REQUEST Request the modification of the secondary PDP context 9B MS -> SS MODIFY PDP CONTEXT ACCEPT MS Accepts PDP context modification. Specific message contents None.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.4 Network reject with Extended Wait Timer
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.4.1 Conformance requirement
An MS configured for NAS signalling low priority indicates this by including the Device properties IE in the appropriate NAS message and setting the low priority indicator to "MS is configured to NAS signalling low priority" except for the following cases in which the MS shall set the low priority indicator to "MS is not configured for NAS signalling low priority": - the MS is performing an attach for emergency bearer services; - the MS has a PDN connection for emergency bearer services established and is performing mobility management procedures, or is establishing a PDN connection for emergency bearer services; - the MS is accessing the network with access class 11 – 15; or - the MS is responding to paging. The network may use the NAS signalling low priority indication for NAS level mobility management congestion control on a per core network node basis and APN based congestion control. If the NAS signalling low priority indication is provided in an ACTIVATE PDP CONTEXT REQUEST message, the SGSN stores the NAS signalling low priority indication within the default PDP context activated due to this request The network may detect and start performing the APN based congestion control when one or more APN congestion criteria as specified in 3GPP TS 23.060 [74] are met. The network may store an APN congestion back-off time on a per MS and congested APN basis and reject any subsequent PDP context activation request, secondary PDP context activation request or PDP context modification request from the MS targeted towards the congested APN before the APN congestion back-off time for the congested APN elapses. Reference 3GPP TS 24.008 clauses 1.8 and 6.1.3.11
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.4.2 Test purpose
1) To verify that the LAP indicator can be set in the UE. 2) To verify that the Delay Tolerant indicator is sent by the UE. 3) To verify that the UE uses the back-off timer if the network reject a request with the T3396 timer.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.4.4.3 Method of test
Specific PICS statements: - PIXIT statements: - Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Test procedure A PDP context activation is requested by the user. The UE shall send the ACTIVATE PDP CONTEXT REQUEST. The SS responds with the ACTIVATE PDP CONTEXT REJECT message with cause code #26, “insufficient resources”, and the T3396 timer with a value of 10 seconds. The UE starts the T3396 timer with the value of 10 seconds. When timer T3396 has expired the UE requests a PDP context activation. Maximum duration of test 5 minutes. Expected sequence Step Direction Message Comments 1 MS Initiate a context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP Context Activation The SS verifies that the IE “Device properties” is set to “MS is configured for NAS signalling low priority” 3 SS -> MS ACTIVATE PDP CONTEXT REJECT The SS includes the IEs SM Cause with value #26 “insufficient resources” and T3396 with value 10 seconds. MS starts timer T3396 with the value of 10 seconds. 4 MS Initiate a PDP Context Activation 5 SS The SS verifies that the UE does not initiate any communication before the T3396 timer has expired 6 MS Initiate a PDP Context Activation 7 MS -> SS ACTIVATE PDP CONTEXT REQUEST Request a PDP Context Activation 8 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP Context Activation Specific message contents None.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5 Secondary PDP context activation procedures
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1 Successful Secondary PDP Context Activation Procedure Initiated by the MS
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.1 QoS Offered by Network is the QoS Requested
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.1.1 Definition
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.1.2 Conformance requirement
In order to request a PDP context activation with the same PDP address and APN as an already active PDP context, the MS shall send an ACTIVATE SECONDARY PDP CONTEXT REQUEST message to the network, enter the state PDP-ACTIVE-PENDING and start timer T3380. The message shall contain the selected NSAPI. The MS shall ensure that the selected NSAPI is not currently being used by another Session Management entity in the MS. The message shall also include a QoS profile, a requested LLC SAPI and the Linked TI. The QoS profile is the requested QoS. Reference 3GPP TS 24.008 clauses 6.1.3.2 and 6.1.3.2.1.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.1.3 Test purpose
To test the behaviour of the MS when SS responds to a Secondary PDP context activation request with the requested QoS.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.1.4 Method of test
Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Specific PICS statements: - PIXIT statements: - Test procedure A PDP context activation is requested by the MS and accepted by the SS. Secondary PDP context activation is requested by the MS. On receipt of the ACTIVATE SECONDARY PDP CONTEXT REQUEST message an ACTIVATE SECONDARY PDP CONTEXT ACCEPT is returned by the SS with the same requested QoS. The SS then waits for T3380 seconds to ensure T3380 has been stopped and no more ACTIVATE SECONDARY PDP CONREXT REQUEST messages are sent by the MS. The SS then sends a MODIFY PDP CONTEXT REQUEST message to which the MS shall reply with a MODIFY PDP CONTEXT ACCEPT message to ensure the PDP context has been activated. Expected sequence Step Direction Message Comments 1 MS Initiate a PDP context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Activate a PDP context 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context 4 MS Initiate a secondary PDP context activation 5 MS -> SS ACTIVATE SECONDARY PDP CONTEXT REQUEST Request a Secondary PDP context activation. Check that TFT filed is present in message and TFT operation is "Create a new TFT". 6 SS -> MS ACTIVATE SECONDARY PDP CONTEXT ACCEPT Accept the Secondary PDP context activation, the QoS is set to the requested QoS. 7 SS Wait for T3380 seconds to ensure no further activate request messages come from the MS 8 SS -> MS MODIFY PDP CONTEXT REQUEST SS sends a modify request to MS for the activated context 9 MS -> SS MODIFY PDP CONTEXT ACCEPT The MS accepts the modification request from the network to show context is activated Specific message contents
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.2 QoS Offered by Network is a lower QoS
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.2.1 QoS accepted by MS
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.2.1.1 Definition
-
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.2.1.2 Conformance requirement
In order to request a PDP context activation with the same PDP address and APN as an already active PDP context, the MS shall send an ACTIVATE SECONDARY PDP CONTEXT REQUEST message to the network, enter the state PDP-ACTIVE-PENDING and start timer T3380. The message shall contain the selected NSAPI. The MS shall ensure that the selected NSAPI is not currently being used by another Session Management entity in the MS. The message shall also include a QoS profile, a requested LLC SAPI and the Linked TI. The QoS profile is the requested QoS. Upon receipt of the message ACTIVATE SECONDARY PDP CONTEXT ACCEPT, the MS shall stop timer T3380 and enter the state PDP-ACTIVE. If the offered QoS parameters received from the network differ from the QoS requested by the MS, the MS shall either accept the negotiated QoS or initiate the PDP context deactivation procedure. In GSM the MS shall initiate establishment of the logical link for the LLC SAPI indicated by the network with the offered QoS and selected radio priority level if no logical link has been already established for that SAPI. If the LLC SAPI indicated by the network can not be supported by the MS, the MS shall initiate the PDP context deactivation procedure. Reference 3GPP TS 24.008 clauses 6.1.3.2 and 6.1.3.2.1.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.2.1.3 Test purpose
To test the behaviour of the MS when the SS responds to a Secondary PDP context activation request with a lower QoS than that requested.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.2.1.4 Method of test
Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Specific PICS statements: - PIXIT statements: - Test procedure The requested QoS and Minimum QoS are set. A PDP context activation is requested by the MS and accepted by the SS. Secondary context activation is requested by the user. On receipt of the ACTIVATE SECONDARY PDP CONTEXT REQUEST message an ACTIVATE SECONDARY PDP CONTEXT ACCEPT is returned by the SS with a QoS lower than the requested but higher than or equal to the minimum. The SS then sends a MODIFY PDP CONTEXT REQUEST message and the MS shall respond with a MODIFY PDP CONTEXT ACCEPT message to confirm the context is active. Expected sequence Step Direction Message Comments 1 MS Initiate a PDP context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Activate a PDP context 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context 4 MS Initiate a secondary PDP context activation 5 MS -> SS ACTIVATE SECONDARY PDP CONTEXT REQUEST Request a Secondary PDP context activation. Check that TFT filed is present in message and TFT operation is "Create a new TFT". 6 SS -> MS ACTIVATE SECONDARY PDP CONTEXT ACCEPT Accept a Secondary PDP context activation, the QoS is lower than the requested QoS and higher that minimum QoS. 7 SS -> MS MODIFY PDP CONTEXT REQUEST Send a modify request to MS for the activated context 8 MS -> SS MODIFY PDP CONTEXT ACCEPT Accept the modification request from network to show context is activated Specific message contents None.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.2.2 QoS rejected by MS
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.2.2.1 Definition
-
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.2.2.2 Conformance requirement
In order to request a PDP context activation with the same PDP address and APN as an already active PDP context, the MS shall send an ACTIVATE SECONDARY PDP CONTEXT REQUEST message to the network, enter the state PDP-ACTIVE-PENDING and start timer T3380. The message shall contain the selected NSAPI. The MS shall ensure that the selected NSAPI is not currently being used by another Session Management entity in the MS. The message shall also include a QoS profile, a requested LLC SAPI and the Linked TI. The QoS profile is the requested QoS. Upon receipt of the message ACTIVATE SECONDARY PDP CONTEXT ACCEPT, the MS shall stop timer T3380 and enter the state PDP-ACTIVE. If the offered QoS parameters received from the network differ from the QoS requested by the MS, the MS shall either accept the negotiated QoS or initiate the PDP context deactivation procedure. In GSM the MS shall initiate establishment of the logical link for the LLC SAPI indicated by the network with the offered QoS and selected radio priority level if no logical link has been already established for that SAPI. If the LLC SAPI indicated by the network can not be supported by the MS, the MS shall initiate the PDP context deactivation procedure. Reference 3GPP TS 24.008 clauses 6.1.3.2 and 6.1.3.2.1.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.2.2.3 Test purpose
To test the behaviour of the MS when the SS responds to a Secondary PDP context activation request with a lower QoS than that requested and not acceptable by the MS.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.1.2.2.4 Method of test
Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Specific PICS statements: - PIXIT statements: - Test procedure The requested QoS and Minimum QoS are set. PDP context activation is requested by the user and accepted by the SS. Secondary PDP context activation is requested by the user. On receipt of the ACTIVATE SECONDARY PDP CONTEXT REQUEST message an ACTIVATE SECONDARY PDP CONTEXT ACCEPT message is returned by the SS with the QoS lower than the minimum. The MS shall then send a DEACTIVATE PDP CONTEXT REQUEST message for the secondary PDP context. A DEACTIVATE PDP CONTEXT ACCEPT message will be sent in return by the SS. Expected sequence Step Direction Message Comments 1 MS Initiate a PDP context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Activate a PDP context 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context 4 MS Initiate a secondary PDP context activation 5 MS -> SS ACTIVATE SECONDARY PDP CONTEXT REQUEST Request a Secondary PDP context activation Check that TFT filed is present in message and TFT operation is "Create a new TFT". 6 SS -> MS ACTIVATE SECONDARY PDP CONTEXT ACCEPT Accept the Secondary PDP context activation with QoS lower than Minimum QoS 7 MS -> SS DEACTIVATE PDP CONTEXT REQUEST Request deactivation of the secondary PDP context SM Cause = #37, ‘QoS not accepted’ Tear down indicator IE shall not be included 8 SS -> MS DEACTIVATE PDP CONTEXT ACCEPT Accept the PDP context deactivation Specific message contents None
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.2 Unsuccessful Secondary PDP Context Activation Procedure Initiated by the MS
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.2.1 Definition
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.2.2 Conformance requirement
Upon receipt of an ACTIVATE SECONDARY PDP CONTEXT REQUEST message, the network may reject the MS initiated PDP context activation by sending an ACTIVATE SECONDARY PDP CONTEXT REJECT message to the MS. Upon receipt of an ACTIVATE SECONDARY PDP CONTEXT REJECT message, the MS shall stop timer T3380 and enter the state PDP-INACTIVE. Reference 3GPP TS 24.008 clauses 6.1.3.2 and 6.1.3.2.2.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.2.3 Test purpose
To test the behaviour of the MS when network rejects the MS initiated Secondary PDP context activation.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.2.4 Method of test
Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Specific PICS statements: - PIXIT statements: - Test procedure A PDP context activation is requested by the user and accepted by the SS. Secondary context activation is requested by the user. On receipt of the ACTIVATE SECONDARY PDP CONTEXT REQUEST message from the MS, an ACTIVATE SECONDARY PDP CONTEXT REJECT with cause #43 'unknown PDP context' is returned by the SS. SS shall wait for T3380 seconds to ensure that the MS sends no more ACTIVATE SECONDARY PDP CONTEXT REQUEST messages. Expected sequence Step Direction Message Comments 1 MS Initiate a PDP context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Activate a PDP context 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context 4 MS Initiate a secondary PDP context activation 5 MS -> SS ACTIVATE SECONDARY PDP CONTEXT REQUEST Request a Secondary PDP context activation. Check that TFT filed is present in message and TFT operation is "Create a new TFT". 6 SS -> MS ACTIVATE SECONDARY PDP CONTEXT REJECT SS rejects the Secondary PDP context activation with cause '#43: unknown PDP context' 7 SS Wait for T3380 seconds to ensure no further ACTIVATE SECONDARY PDP CONTEXT REQUEST messages come from the MS Specific message contents None.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.3 Abnormal cases
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.3.1 T3380 Expiry
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.3.1.1 Definition
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.3.1.2 Conformance requirement
1) On the first expiry of the timer T3380, the MS shall re-send the ACTIVATE SECONDARY PDP CONTEXT REQUEST. 2) On the second expiry of the timer T3380, the MS shall re-send the ACTIVATE SECONDARY PDP CONTEXT REQUEST. 3) On the third expiry of the timer T3380, the MS shall re-send the ACTIVATE SECONDARY PDP CONTEXT REQUEST. 4) On the fourth expiry of the timer T3380, the MS shall re-send the ACTIVATE SECONDARY PDP CONTEXT REQUEST. 5) On the fifth expiry of the timer T3380, the MS shall release all resources possibly allocated for this invocation and shall abort the procedure; no automatic secondary PDP context activation re-attempt shall be performed. Reference 3GPP TS 24.008 clause 6.1.3.2.3 a).
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.3.1.3 Test purpose
To test the behaviour of the MS when the SS does not reply to ACTIVATE SECONDARY PDP CONTEXT REQUEST message.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.2.5.3.1.4 Method of test
Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Specific PICS statements: - PIXIT statements: - Test procedure A PDP context is activated by the user and accepted by the SS. Secondary PDP context activation is requested by the user. The MS shall send ACTIVATE SECONDARY PDP CONTEXT REQUEST message five times with T3380 seconds between each message. After this, no further ACTIVATE SECONDARY PDP CONTEXT REQUEST messages shall be sent by the MS. Expected sequence Step Direction Message Comments 1 MS Initiate a PDP context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Activate a PDP context 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context 4 MS Initiate a secondary PDP context activation 5 MS -> SS ACTIVATE SECONDARY PDP CONTEXT REQUEST Request a Secondary PDP context activation 6 SS T3380 +10% seconds 7 MS -> SS ACTIVATE SECONDARY PDP CONTEXT REQUEST Request the Secondary PDP context activation 8 SS T3380 +10% seconds 9 MS -> SS ACTIVATE SECONDARY PDP CONTEXT REQUEST Request the Secondary PDP context activation 10 SS T3380 +10% seconds 11 MS -> SS ACTIVATE SECONDARY PDP CONTEXT REQUEST Request the Secondary PDP context activation 12 SS T3380 +10% seconds 13 MS -> SS ACTIVATE SECONDARY PDP CONTEXT REQUEST Request the Secondary PDP context activation 14 SS Wait for T3380 +10% seconds to ensure no further ACTIVATE SECONDARY PDP CONTEXT REQUEST messages are sent by the MS Specific message contents None.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3 PDP context modification procedure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.1 Network initiated PDP context modification
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.1.1 Conformance requirement
1) Upon receipt of a MODIFY PDP CONTEXT REQUEST message. - If the MS can accept the modification requested, the MS shall reply with the MODIFY PDP CONTEXT ACCEPT message. - If the MS is unable to accept the modification requested, the MS shall initiate the PDP context deactivation procedure for the NSAPI that has been indicated in the message MODIFY PDP CONTEXT REQUEST - the reject cause IE value of the DEACTIVATE PDP CONTEXT REQUEST message shall indicate "QoS not accepted". 2) The MS shall either accept the modification request or deactivate the PDP context, it shall not ignore the modification request. Reference 3GPP TS 04.08 / 3GPP TS 24.008 subclause 6.1.3.2.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.1.2 Test purpose
To test the behaviour of the MS upon receipt of a MODIFY PDP CONTEXT REQUEST message.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.1.3 Method of test
Specific PICS statements: - PIXIT statements: - Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Test procedure A PDP context is activated by the user and accepted by the SS. A MODIFY PDP CONTEXT REQUEST message is then sent to the MS with a QoS that is acceptable to the MS (higher than or equal to the minimum QoS set in the MS). The MS shall send a MODIFY PDP CONTEXT ACCEPT message in return. A MODIFY PDP CONTEXT REQUEST message is then sent to the MS with a QoS that is not acceptable to the MS (lower than the minimum QoS set in the MS). The MS shall send a DEACTIVATE PDP CONTEXT REQUEST message in return. Maximum duration of test 5 minutes. Expected sequence Step Direction Message Comments 1 MS Initiate a context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Activate a PDP context 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context 4 SS -> MS MODIFY PDP CONTEXT REQUEST Request the modification of a PDP context 5 MS -> SS MODIFY PDP CONTEXT ACCEPT Accept the PDP context modification 6 SS -> MS MODIFY PDP CONTEXT REQUEST Request the modification of a PDP context 7 MS -> SS DEACTIVATE PDP CONTEXT REQUEST Reject the PDP context modification by deactivating the PDP context. Cause set to 'QoS not acceptable' 8 SS -> MS DEACTIVATE PDP CONTEXT ACCEPT Accept the PDP context deactivation Specific message contents As default except: Activate PDP Context Request Information Element Value/remark Transaction identifier In the range 0-6 Transaction identifier flag 0 NSAPI In the range 5-15 Requested LLC SAPI 3, 5, 9 or 11 Requested QoS Arbitrarily chosen Requested PDP address Arbitrarily chosen Activate PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Negotiated LLC SAPI As above Negotiated QoS As above Radio priority level Arbitrarily chosen Spare half octet 0 Modify PDP Context Request (used in step 4) Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Radio priority level As above Spare half octet 0 Requested LLC SAPI As above New QoS Higher than or equal to the minimum QoS and lower than the requested QoS. Modify PDP Context Request (used in step 6) Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Radio priority level As above Spare half octet 0 Requested LLC SAPI As above New QoS Lower than the minimum QoS Modify PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 0 Deactivate PDP Context Request Information Element Value/remark Transaction identifier As above Transaction identifier flag 0 SM cause QoS not acceptable Deactivate PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 1
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.2 MS initiated PDP context modification
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.2.1 MS initiated PDP Context Modification accepted by network
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.2.1.1 Definition
-
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.2.1.2 Conformance requirement
In order to initiate the procedure, the MS sends the MODIFY PDP CONTEXT REQUEST message to the network, enters the state PDP-MODIFY-PENDING and starts timer T3381. The message may contain the requested new QoS and/or the TFT and the requested LLC SAPI (used in GSM). Upon receipt of the MODIFY PDP CONTEXT REQUEST message, the network may reply with the MODIFY PDP CONTEXT ACCEPT message in order to accept the context modification. The reply message may contain the negotiated QoS and the radio priority level based on the new QoS profile and the negotiated LLC SAPI that shall be used in GSM by the logical link. Upon receipt of the MODIFY PDP CONTEXT ACCEPT message, the MS shall stop the timer T3381. If the offered QoS parameters received from the network differs from the QoS requested by the MS, the MS shall either accept the negotiated QoS or initiate the PDP context deactivation procedure. Reference 3GPP TS 24.008 clauses 6.1.3.3 and 6.1.3.3.2.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.2.1.3 Test purpose
To test the behaviour of the MS upon receipt of a MODIFY PDP CONTEXT ACCEPT message from the network with - Requested QoS;
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.2.1.4 Method of test
Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Specific PICS statements: MS Higher Layer release (TSPC_MS_HIGHER_LAYER_RELEASE) PIXIT statements: - Test procedure For a R97 to R7 MS, MS initiated PDP Context Modification for first PDP context is supported. For a R8 MS, MS initiated PDP Context Modification for first PDP context is not supported. Hence this TC is not applicable. The requested QoS and Minimum QoS are set. A PDP context is activated by the user and accepted by the SS. The MS initiates a PDP context modification by sending a MODIFY PDP CONTEXT REQUEST message with new QoS. The SS accepts the context modification and replies with the MODIFY PDP CONTEXT ACCEPT message with the QoS requested. The SS waits ‘T3390’ seconds to confirm that UE will not initiate a PDP context deactivation. Expected sequence Step Direction Message Comments 1 MS Initiate a PDP context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Activate a PDP context 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context 4 MS -> SS MODIFY PDP CONTEXT REQUEST Request the modification of a PDP context, with new QoS 5 SS -> MS MODIFY PDP CONTEXT ACCEPT Accept the PDP context modification with QoS requested 6 SS waits ‘T3390’ seconds to confirm UE does not initiate PDP context deactivation. Specific message contents None.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.2.2 MS initiated PDP Context Modification not accepted by the network
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.2.2.1 Definition
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.2.2.2 Conformance requirement
In order to initiate the procedure, the MS sends the MODIFY PDP CONTEXT REQUEST message to the network, enters the state PDP-MODIFY-PENDING and starts timer T3381. The message may contain the requested new QoS and/or the TFT and the requested LLC SAPI (used in GSM). Upon receipt of a MODIFY PDP CONTEXT REQUEST message, the network may reject the MS initiated PDP context modification request by sending a MODIFY PDP CONTEXT REJECT message to the MS. The message shall contain a cause code that typically indicates one of the following: # 26: insufficient resources; # 32: Service option not supported; # 41: semantic error in the TFT operation; # 42: syntactical error in the TFT operation; # 44: semantic errors in packet filter(s); # 45: syntactical errors in packet filter(s); # 95 - 111: protocol errors. Upon receipt of a MODIFY PDP CONTEXT REJECT message, the MS shall stop timer T3381 and enter the state PDP-ACTIVE. Reference 3GPP TS 24.008 clauses 6.1.3.3, 6.1.3.3.2 and 6.1.3.3.3.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.2.2.3 Test purpose
To test the behaviour of the MS upon receipt of a MODIFY PDP CONTEXT REJECT message from the network.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.2.2.4 Method of test
Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Specific PICS statements: • MS Higher Layer release (TSPC_MS_HIGHER_LAYER_RELEASE) PIXIT statements: - Test procedure For a R97 to R7 MS, MS initiated PDP Context Modification for first PDP context is supported. For a R8 MS, MS initiated PDP Context Modification for first PDP context is not supported. Hence this TC is not applicable. A PDP context is activated by the user and accepted by the SS. The MS initiates a PDP context modification by sending a MODIFY PDP CONTEXT REQUEST message. The SS rejects the context modification and replies with the MODIFY PDP CONTEXT REJECT with cause set to # 26: insufficient resources. Expected sequence Step Direction Message Comments 1 MS Initiate a PDP context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Activate a PDP context 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context 4 MS -> SS MODIFY PDP CONTEXT REQUEST Request the modification of a PDP context 5 SS -> MS MODIFY PDP CONTEXT REJECT SS rejects PDP context modification SM cause set to # 26: ‘insufficient resources’ 6 SS Wait for T3381 seconds to ensure no further MODIFY PDP CONTEXT REQUEST messages are sent by the MS Specific message contents None.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.3 Abnormal cases
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.3.1 T3381 Expiry
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.3.1.1 Definition
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.3.1.2 Conformance requirement
On the first expiry of timer T3381, the MS shall resend the MODIFY PDP CONTEXT REQUEST message reset and restart timer T3381. This retransmission is repeated four times, i.e. on the fifth expiry of timer T3381, the MS may continue to use the previously negotiated QoS or it may initiate the PDP context deactivation procedure. Reference 3GPP TS 24.008 clause 6.1.3.3.4 a) case: In the MS.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.3.1.3 Test purpose
To test the behaviour of the MS when SS does not reply to MODIFY PDP CONTEXT REQUEST message.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.3.1.4 Method of test
Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Specific PICS statements: • MS Higher Layer release (TSPC_MS_HIGHER_LAYER_RELEASE) PIXIT statements: - Test procedure For a R97 to R7 MS, MS initiated PDP Context Modification for first PDP context is supported. For a R8 MS, MS initiated PDP Context Modification for first PDP context is not supported. Hence this TC is not applicable. A PDP context activation is requested by the user and accepted by the SS. The MS shall send MODIFY PDP CONTEXT REQUEST message five times with T3381 seconds between each message. After this no further MODIFY PDP CONTEXT REQUEST messages shall be sent by the MS. Expected sequence Step Direction Message Comments 1 MS Initiate a PDP context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Activate a PDP context 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context activation 4 MS -> SS MODIFY PDP CONTEXT REQUEST Request modification of the PDP context, with new QoS 5 SS T3381 ±10% seconds 6 MS -> SS MODIFY PDP CONTEXT REQUEST Request modification of the PDP context, with new QoS 7 SS T3381 ±10% seconds 8 MS -> SS MODIFY PDP CONTEXT REQUEST Request modification of the PDP context, with new QoS 9 SS T3381 ±10% seconds 10 MS -> SS MODIFY PDP CONTEXT REQUEST Request modification of the PDP context, with new QoS 11 SS T3381 ±10% seconds 12 MS -> SS MODIFY PDP CONTEXT REQUEST Request modification of the PDP context, with new QoS 13 SS Wait for T3381 +10% seconds to ensure no further MODIFY PDP CONTEXT REQUEST messages are sent by the MS. The MS may initiate PDP context deactivation procedure. Specific message contents None.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.3.2 Collision of MS and network initiated PDP context modification procedures
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.3.2.1 Definition
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.3.2.2 Conformance requirement
A collision of a MS and network initiated PDP context modification procedures is identified by the MS if a MODIFY PDP CONTEXT REQUEST message is received from the network after the MS has sent a MODIFY PDP CONTEXT REQUEST message itself, and both messages contain the same TI and the MS has not yet received a MODIFY PDP CONTEXT ACCEPT message from the network. In the case of such a collision, the network initiated PDP context modification shall take precedence over the MS initiated PDP context modification. The MS shall terminate internally the MS initiated PDP context modification procedure, enter the state PDP-Active and proceed with the network initiated PDP context modification procedure by sending a MODIFY PDP CONTEXT ACCEPT message. The network shall ignore the MODIFY PDP CONTEXT REQUEST message received in the state PDP-MODIFY-PENDING. The network shall proceed with the network initiated PDP context modification procedure as if no MODIFY PDP CONTEXT REQUEST message was received from the MS. Reference 3GPP TS 24.008 clause 6.1.3.3.4 b).
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.3.2.3 Test purpose
To test behaviour of the MS when it identifies collision of the MS and SS initiated PDP context modification with the same TI.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.3.3.2.4 Method of test
Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Specific PICS statements: MS Higher Layer release (TSPC_MS_HIGHER_LAYER_RELEASE) PIXIT statements: - Test procedure For a R97 to R7 MS, MS initiated PDP Context Modification for first PDP context is supported. For a R8 MS, MS initiated PDP Context Modification for first PDP context is not supported. Hence this TC is not applicable. A PDP context is activated by the user and accepted by the SS. The MS initiates a PDP context modification by sending a MODIFY PDP CONTEXT REQUEST message. Then the SS initiates the PDP context modification by sending MODIFY PDP CONTEXT REQUEST message with the same TI. The MS shall reply to the SS initiated PDP context modification procedure by sending MODIFY PDP CONTEXT ACCEPT message with the same TI. Expected sequence Step Direction Message Comments 1 MS Initiate a PDP context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Activate a PDP context 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context activation 4 MS -> SS MODIFY PDP CONTEXT REQUEST Request modification of the PDP context, with new QoS 5 SS -> MS MODIFY PDP CONTEXT REQUEST Request modification of the PDP context with the same TI 6 MS MS identifies collision, terminates internally the MS initiated PDP context modification procedure 7 MS -> SS MODIFY PDP CONTEXT ACCEPT Accept SS initiated PDP context modification. The TI flag set to 0. 8 SS Wait for T3381 +10% seconds from Step 4 to ensure no further MODIFY PDP CONTEXT REQUEST messages are sent by the MS Specific message contents Activate PDP Context Request (used in step 2) Information Element Value/remark Transaction identifier In the range 0-6 Transaction identifier flag 0 NSAPI In the range 5-15 Requested LLC SAPI 3, 5, 9 or 11 Requested QoS Arbitrarily chosen Requested PDP address Arbitrarily chosen Modify PDP Context Request (MS to Network direction) (used in step 4) Information Element Value/remark Transaction identifier As above Transaction identifier flag 0 Modify PDP Context Request (Network to MS direction) (used in step 5) Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Modify PDP Context Accept (used in step 7) Information Element Value/remark Transaction identifier As above Transaction identifier flag 0
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.4 PDP context deactivation procedure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.4.1 PDP context deactivation initiated by the MS
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.4.1.1 Conformance requirement
The message contains the transaction identifier in use for the PDP context to be deactivated and a cause code that typically indicates one of the following causes: - #26: insufficient resources; - #36: regular PDP context deactivation; or - #37: QoS not accepted. Upon receipt of the DEACTIVATE PDP CONTEXT ACCEPT message, the MS shall stop timer T3390. - Whenever any session management message except REQUEST PDP CONTEXT ACTIVATION or SM‑STATUS is received by the MS specifying a transaction identifier which is not recognised as relating to an active context or to a context that is in the process of activation or deactivation the MS shall send a SM-STATUS message with cause #81 "invalid transaction identifier value" using the received transaction identifier value and remain in the PDP-INACTIVE state. Reference 3GPP TS 04.08 / 3GPP TS 24.008 subclauses 6.1.3.3.1 and 8.3.2 (b).
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.4.1.2 Test purpose
To test the behaviour of the MS upon receipt of a DEACTIVATE PDP CONTEXT ACCEPT message from the network.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.4.1.3 Method of test
Specific PICS statements: - PIXIT statements: - Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Test procedure A PDP context is activated by the user and accepted by the SS. The context deactivation is then requested by the user. The MS shall send a DEACTIVATE PDP CONTEXT REQUEST message to the SS. The SS shall then reply with a DEACTIVATE PDP CONTEXT ACCEPT message. The SS shall then wait for T3390 +10% seconds to ensure T3390 has been stopped and that no further messages are sent from the MS. If the MS did not initiate detach procedure, the SS shall then send a MODIFY PDP CONTEXT REQUEST for the deactivated context and the MS shall reply with an SM STATUS message with cause #81 'transaction identifier not known'. Maximum duration of test 5 minutes. Expected sequence Step Direction Message Comments 1 MS Initiate a context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Activate a PDP context 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context 4 MS Initiate a context deactivation 5 MS -> SS DEACTIVATE PDP CONTEXT REQUEST Request a deactivation of a PDP context 6 SS -> MS DEACTIVATE PDP CONTEXT ACCEPT Accept the PDP context deactivation 7 SS Wait for T3390 +10% seconds to ensure no further deactivate request messages are sent Note: The MS may initiate Detach procedure during this time. 8A MS -> SS DETACH REQUEST 9A SS -> MS DETACH ACCEPT 8B SS -> MS MODIFY PDP CONTEXT REQUEST Send a modify request for the deactivated context. 9B MS -> SS SM STATUS Cause set to #81 Note: Branch ‘A’ is applicable if the MS initiates Detach procedure after the PDP context is deactivated. Otherwise branch ‘B’ is applicable. Specific message contents As default except: Activate PDP Context Request Information Element Value/remark Transaction identifier In the range 0-6 Transaction identifier flag 0 NSAPI In the range 5-15 Requested LLC SAPI 3, 5, 9 or 11 Requested QoS Arbitrarily chosen Requested PDP address Arbitrarily chosen Activate PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Negotiated LLC SAPI As above Negotiated QoS As above Radio priority level Arbitrarily chosen Spare half octet 0 Deactivate PDP Context Request Information Element Value/remark Transaction identifier As above Transaction identifier flag 0 SM cause Regular Deactivation Deactivate PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Modify PDP Context Request Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Radio priority level As above Spare half octet 0 Requested LLC SAPI As above New QoS As above SM Status Information Element Value/remark Transaction identifier As above Transaction identifier flag 0 SM Cause #81
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.4.2 PDP context deactivation initiated by the network
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.4.2.1 Conformance requirement
The MS shall, upon receipt of the DEACTIVATE PDP CONTEXT REQUEST message, reply with a DEACTIVATE PDP CONTEXT ACCEPT message. - Whenever any session management message except REQUEST PDP CONTEXT ACTIVATION or SM‑STATUS is received by the MS specifying a transaction identifier which is not recognised as relating to an active context or to a context that is in the process of activation or deactivation the MS shall send a SM-STATUS message with cause #81 "invalid transaction identifier value" using the received transaction identifier value and remain in the PDP-INACTIVE state. Reference 3GPP TS 04.08 / 3GPP TS 24.008 subclauses 6.1.3.3.2 and 8.3.2 (b).
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.4.2.2 Test purpose
To test the behaviour of the MS upon receipt of a DEACTIVATE PDP CONTEXT REQUEST message from the network.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.4.2.3 Method of test
Specific PICS statements: - PIXIT statements: - Initial conditions System Simulator: 1 cell, default parameters. Mobile Station: The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN. Test procedure A PDP context is activated by the user and accepted by the SS. A DEACTIVATE PDP CONTEXT REQUEST message is then sent by the SS. The MS shall reply with a DEACTIVATE PDP CONTEXT ACCEPT message. If the MS did not initiate detach procedure, the SS shall then send a MODIFY PDP CONTEXT REQUEST for the deactivated context and the MS shall reply with an SM STATUS message with cause #81 'transaction identifier not known'. Maximum duration of test 5 minutes. Expected sequence Step Direction Message Comments 1 MS Initiate a context activation 2 MS -> SS ACTIVATE PDP CONTEXT REQUEST Activate a PDP context 3 SS -> MS ACTIVATE PDP CONTEXT ACCEPT Accept the PDP context 4 SS -> MS DEACTIVATE PDP CONTEXT REQUEST Request a deactivation of a PDP context 5 MS -> SS DEACTIVATE PDP CONTEXT ACCEPT Accept the PDP context deactivation. Wait for 10 seconds. The MS may initiate Detach procedure. 6A MS -> SS DETACH REQUEST 6B SS -> MS MODIFY PDP CONTEXT REQUEST Send a modify request for the deactivated context. 7B MS -> SS SM STATUS Cause set to #81 Note: Branch ‘A’ is applicable if the MS initiates Detach procedure after the PDP context is deactivated. Otherwise branch ‘B’ is applicable. Specific message contents As default except: Activate PDP Context Request Information Element Value/remark Transaction identifier In the range 0-6 Transaction identifier flag 0 NSAPI In the range 5-15 Requested LLC SAPI 3, 5, 9 or 11 Requested QoS Arbitrarily chosen Requested PDP address Arbitrarily chosen Activate PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Negotiated LLC SAPI As above Negotiated QoS As above Radio priority level Arbitrarily chosen Spare half octet 0 Deactivate PDP Context Request Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 SM cause Regular Deactivation Deactivate PDP Context Accept Information Element Value/remark Transaction identifier As above Transaction identifier flag 0 Modify PDP Context Request Information Element Value/remark Transaction identifier As above Transaction identifier flag 1 Radio priority level As above Spare half octet 0 Requested LLC SAPI As above New QoS As above SM Status Information Element Value/remark Transaction identifier As above Transaction identifier flag 0 SM Cause #81
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.4.3 Abnormal cases
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.4.3.1 T3390 Expiry
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
45.4.3.1.1 Conformance requirement
1) On the first expiry of timer T3390, the MS shall resend the message DEACTIVATE PDP CONTEXT REQUEST. 2) On the second expiry of timer T3390, the MS shall resend the message DEACTIVATE PDP CONTEXT REQUEST. 3) On the third expiry of timer T3390, the MS shall resend the message DEACTIVATE PDP CONTEXT REQUEST. 4) On the fourth expiry of timer T3390, the MS shall resend the message DEACTIVATE PDP CONTEXT REQUEST. 5) On the fifth expiry of timer T3390, the MS shall release all resources allocated and shall erase the PDP context related data. Reference 3GPP TS 04.08 / 3GPP TS 24.008 subclause 6.1.3.3.3.