algorithmic_trading / RELEASE_CHECKLIST.md
Edwin Salguero
feat: Add comprehensive branch protection and release management
a13907f

πŸ“‹ Release Checklist Template

πŸš€ Pre-Release Preparation

Code Quality & Testing

  • All CI/CD checks pass
  • Test coverage > 80%
  • No security vulnerabilities detected
  • Performance benchmarks met
  • All tests pass locally
  • Integration tests completed

Trading-Specific Validation

  • Strategy backtesting passed
  • Risk limits validated
  • Model performance acceptable
  • Compliance checks passed
  • Position limits enforced
  • Drawdown limits verified

Documentation

  • README.md updated
  • API documentation current
  • Changelog prepared
  • Migration notes (if needed)
  • Release notes drafted
  • User guide updated

Infrastructure

  • Docker image builds successfully
  • Docker Hub credentials configured
  • Environment variables documented
  • Configuration files updated
  • Dependencies reviewed

πŸ” Release Validation

Automated Checks

  • Quality assurance pipeline passed
  • Security scan completed
  • Performance tests passed
  • Backtesting validation successful
  • Docker build successful
  • Documentation generation completed

Manual Verification

  • Code review completed (2+ reviewers)
  • Trading expert approval received
  • Risk management review completed
  • Security review completed
  • Performance review completed

Pre-Deployment Testing

  • Staging environment deployment successful
  • Smoke tests passed
  • Integration tests passed
  • Performance tests passed
  • User acceptance testing completed

🏷️ Release Process

Version Management

  • Version number updated
  • Changelog updated
  • Release notes finalized
  • Tag created with proper message
  • Branch protection rules verified

Release Creation

# Create release branch
git checkout -b release/v1.2.0

# Update version files
# Update CHANGELOG.md
# Update documentation

# Commit changes
git add .
git commit -m "chore: prepare release v1.2.0"

# Create tag
git tag -a v1.2.0 -m "Release v1.2.0: Enhanced risk management"

# Push tag (triggers release workflow)
git push origin v1.2.0

Post-Release Verification

  • Release workflow completed successfully
  • Docker image pushed to Docker Hub
  • Documentation deployed
  • Release notes published
  • Notifications sent

🚨 Critical Trading Checks

Risk Management

  • Maximum position size: 100 shares
  • Maximum portfolio allocation: 5%
  • Maximum drawdown: 5%
  • Stop-loss orders configured
  • Take-profit orders configured

Strategy Validation

  • Minimum Sharpe ratio: 0.5
  • Maximum volatility: 20%
  • Minimum backtesting period: 6 months
  • Strategy logic verified
  • Performance metrics acceptable

Compliance

  • Regulatory compliance verified
  • Risk limits enforced
  • Audit trail maintained
  • Trading permissions verified
  • API rate limits respected

πŸ“Š Performance Monitoring

Pre-Release Metrics

  • Strategy execution time < 100ms
  • Memory usage < 1GB
  • CPU usage < 80%
  • API response time < 500ms
  • Error rate < 0.1%

Post-Release Monitoring (24h)

  • Error rate monitoring
  • Performance tracking
  • User feedback collection
  • System health monitoring
  • Trading performance validation

πŸ”§ Emergency Procedures

Rollback Plan

  • Previous version identified
  • Rollback procedure documented
  • Rollback team notified
  • Rollback timeline established
  • Communication plan prepared

Critical Issues Response

  • Stop trading immediately
  • Assess impact and scope
  • Apply emergency fix
  • Deploy hotfix
  • Notify stakeholders
  • Document incident

πŸ“’ Communication

Internal Notifications

  • Development team notified
  • Trading team notified
  • Operations team notified
  • Management notified
  • Support team briefed

External Communications

  • Release announcement prepared
  • User documentation updated
  • API documentation updated
  • Community notifications sent
  • Support tickets updated

βœ… Release Completion

Final Verification

  • All automated checks passed
  • Manual verification completed
  • Performance monitoring active
  • Error tracking configured
  • User feedback channels open

Post-Release Activities

  • Monitor system for 24 hours
  • Collect user feedback
  • Address any issues promptly
  • Update release notes if needed
  • Plan next release cycle

πŸ“ˆ Success Metrics

Quality Metrics

  • Zero critical bugs in first 24h
  • Performance maintained
  • User satisfaction > 4.5/5
  • System uptime > 99.9%

Trading Metrics

  • Strategy performance > benchmark
  • Risk compliance: 100%
  • Error rate < 0.1%
  • Execution time < 100ms

🎯 Release Checklist Usage

For Major Releases (vX.0.0)

  • Complete ALL checklist items
  • Require trading expert approval
  • Perform extensive testing
  • Include migration guide

For Minor Releases (vX.Y.0)

  • Complete core checklist items
  • Require code review
  • Perform standard testing
  • Update documentation

For Patch Releases (vX.Y.Z)

  • Complete essential checklist items
  • Quick review by maintainer
  • Regression testing
  • Update release notes

Note: This checklist is specifically designed for algorithmic trading systems where code quality directly impacts financial performance and risk management. Always prioritize safety and compliance over speed.