@@ -114,41 +114,41 @@ Required Analysis:
114
  Carefully Observe the Video
115
  Watch the video for visual cues related to production interruptions.
116
  Take note of any technician or machinery activity that deviates from standard workflow.
117
- Record the observed time taken for each step.
118
  Analyze Each Step Against Standard Times
119
  For each step, compare the observed time taken with the provided standard time. If the time exceeds the standard, investigate the reason for the delay. Use the following guidelines for each step:
120
 
121
 
122
  step1 : Bead Insertion
123
- Standard Time: 4 seconds
124
  Analysis: Observe the bead placement process. If the insertion exceeds 4 seconds, identify potential issues such as missing beads, technician errors, or machinery malfunction.
125
 
126
- step2 :Inner Layer Adjustment by Technician
127
- Standard Time: 4 seconds
128
  Analysis: Check for manual intervention during the inner layer application. If adjustment is required, it may indicate improper alignment or issues with the layer material.
129
 
130
- Step3:Manual Adjustment in Ply1 Apply
131
- Standard Time: 4 seconds
132
  Analysis: Determine if the technician is manually adjusting the first ply. Manual intervention might suggest improper ply placement or machine misalignment.
133
 
134
- step4:Delay in Bead Set Step
135
- Standard Time: 8 seconds
136
  Analysis: Observe the bead setting process. Delays may result from bead misalignment, machine pauses, or lack of technician involvement.
137
 
138
- step5:Delay in Turnup Step
139
  Standard Time: 4 seconds
140
  Analysis: Examine the turnup step for any technician involvement or pauses in machine operation. Reasons for delays might include material misalignment or equipment issues.
141
 
142
- step6:Technician Repairing Sidewall
143
- Standard Time: 14 seconds
144
  Analysis: If a technician is repairing the sidewall, this may indicate material damage or improper initial application. Look for signs of excessive manual handling.
145
 
146
- step7:Delay in Sidewall Stitching
147
- Standard Time: 5 seconds
148
  Analysis: Observe the stitching process. Delays could occur due to machine speed inconsistencies or technician intervention for correction.
149
 
150
- step8:Technician Availability During Carcass Unload
151
- Standard Time: 7 seconds
152
  Analysis: Ensure a technician is present for the carcass unload. If absent, note their return time and identify potential reasons for their absence.
153
 
154
  Correlate Visual Evidence with Delay Reasons
@@ -162,14 +162,15 @@ Document secondary reasons if multiple factors contribute to a delay.
162
  Generate a Comprehensive Report
163
  Summarize the analysis for each step:
164
 
165
- Was the observed time within the standard limit?
166
  What caused any deviations?
167
  Suggested corrective actions for identified delays.
168
- Provide visual snapshots or timestamps from the video to support the findings.
169
 
170
  Note:
171
  Pay special attention to recurring issues across multiple steps.
172
- Ensure accurate timing by using a stopwatch or frame-based analysis tools for precise observations.
 
173
  Please provide your analysis in the following format:
174
  1. Selected Reason: [State the most likely reason from the given options]
175
  2. Visual Evidence: [Describe specific visual cues that support your selection]
 
114
  Carefully Observe the Video
115
  Watch the video for visual cues related to production interruptions.
116
  Take note of any technician or machinery activity that deviates from standard workflow.
117
+ #Record the observed time taken for each step.
118
  Analyze Each Step Against Standard Times
119
  For each step, compare the observed time taken with the provided standard time. If the time exceeds the standard, investigate the reason for the delay. Use the following guidelines for each step:
120
 
121
 
122
  step1 : Bead Insertion
123
+ #Standard Time: 4 seconds
124
  Analysis: Observe the bead placement process. If the insertion exceeds 4 seconds, identify potential issues such as missing beads, technician errors, or machinery malfunction.
125
 
126
+ step2 :Inner Liner Apply.
127
+ #Standard Time: 4 seconds
128
  Analysis: Check for manual intervention during the inner layer application. If adjustment is required, it may indicate improper alignment or issues with the layer material.
129
 
130
+ Step3:Ply1 Apply
131
+ #Standard Time: 4 seconds
132
  Analysis: Determine if the technician is manually adjusting the first ply. Manual intervention might suggest improper ply placement or machine misalignment.
133
 
134
+ step4:Bead Set
135
+ #Standard Time: 8 seconds
136
  Analysis: Observe the bead setting process. Delays may result from bead misalignment, machine pauses, or lack of technician involvement.
137
 
138
+ step5:Turnup
139
  Standard Time: 4 seconds
140
  Analysis: Examine the turnup step for any technician involvement or pauses in machine operation. Reasons for delays might include material misalignment or equipment issues.
141
 
142
+ step6:Sidewall Apply
143
+ #Standard Time: 14 seconds
144
  Analysis: If a technician is repairing the sidewall, this may indicate material damage or improper initial application. Look for signs of excessive manual handling.
145
 
146
+ step7:Sidewall Stitching
147
+ #Standard Time: 5 seconds
148
  Analysis: Observe the stitching process. Delays could occur due to machine speed inconsistencies or technician intervention for correction.
149
 
150
+ step8:Carcass Unload
151
+ #Standard Time: 7 seconds
152
  Analysis: Ensure a technician is present for the carcass unload. If absent, note their return time and identify potential reasons for their absence.
153
 
154
  Correlate Visual Evidence with Delay Reasons
 
162
  Generate a Comprehensive Report
163
  Summarize the analysis for each step:
164
 
165
+ #Was the observed time within the standard limit?
166
  What caused any deviations?
167
  Suggested corrective actions for identified delays.
168
+ #Provide visual snapshots or timestamps from the video to support the findings.
169
 
170
  Note:
171
  Pay special attention to recurring issues across multiple steps.
172
+ #Ensure accurate timing by using a stopwatch or frame-based analysis tools for precise observations.
173
+
174
  Please provide your analysis in the following format:
175
  1. Selected Reason: [State the most likely reason from the given options]
176
  2. Visual Evidence: [Describe specific visual cues that support your selection]