Update info.md
Browse files
info.md
CHANGED
@@ -1693,7 +1693,7 @@ MMSCFD = million standard cubic feet per day
|
|
1693 |
• Maximum delivery to PTT recorded around 750 MMSCFD in May 2011.
|
1694 |
|
1695 |
|
1696 |
-
|
1697 |
|
1698 |
SSHE HANDBOOK FOR EMPLOYEE AND CONTRACTOR
|
1699 |
PTTEP REVISION 2021
|
@@ -1993,6 +1993,4 @@ General requirements:
|
|
1993 |
In case of emergency, it is required to act as follow:
|
1994 |
- Follow site emergency and crisis management plan when in emergency situation.
|
1995 |
- Stop work and return working area in safe condition, if possible. Report situation to the site’s emergency call center - name of reporter or witness - the Incident scene - description of the incident.
|
1996 |
-
- Evacuate to the muster / assembly point, if required or heard an evacuation alarm. - Follow instructions of the person-in-charge at the assembly point.
|
1997 |
-
|
1998 |
-
|
|
|
1693 |
• Maximum delivery to PTT recorded around 750 MMSCFD in May 2011.
|
1694 |
|
1695 |
|
1696 |
+
SSHE
|
1697 |
|
1698 |
SSHE HANDBOOK FOR EMPLOYEE AND CONTRACTOR
|
1699 |
PTTEP REVISION 2021
|
|
|
1993 |
In case of emergency, it is required to act as follow:
|
1994 |
- Follow site emergency and crisis management plan when in emergency situation.
|
1995 |
- Stop work and return working area in safe condition, if possible. Report situation to the site’s emergency call center - name of reporter or witness - the Incident scene - description of the incident.
|
1996 |
+
- Evacuate to the muster / assembly point, if required or heard an evacuation alarm. - Follow instructions of the person-in-charge at the assembly point.
|
|
|
|