Spaces:
Sleeping
Sleeping
GAIA Framework Improvement Plan - ToDo List
- Create overall output document structure (
gaia_improvement_plan.md). - Generate ASCII diagram of the revised architecture (incorporating proposed changes).
- Perform Code Quality Review:
- Review
app.py - Review
role_agent.py - Review
image_analyzer_agent.py - Review
verifier_agent.py - Review
research_agent.py - Review
text_analyzer_agent.py - Review
reasoning_agent.py - Review
planner_agent.py - Review
code_agent.py - Review
math_agent.py(note truncation) - Consolidate findings for Code Quality section in the report.
- Review
- Develop Refactor Proposals:
- Propose refactors for
app.py(if any) + generate diff. - Propose refactors for
role_agent.py(if any) + generate diff. - Propose refactors for
image_analyzer_agent.py(if any) + generate diff. - Propose refactors for
verifier_agent.py(if any) + generate diff. - Propose refactors for
research_agent.py(if any) + generate diff. - Propose refactors for
text_analyzer_agent.py(if any) + generate diff. - Propose refactors for
reasoning_agent.py(if any) + generate diff. - Propose refactors for
planner_agent.py(if any) + generate diff. - Propose refactors for
code_agent.py(if any) + generate diff. - Propose refactors for
math_agent.py(if any) + generate diff. - Consolidate proposals for Refactoring section in the report.
- Propose refactors for
- Design New Features:
- Design YouTube Ingestion feature (module/agent, steps, tools, API).
- Design Generic Audio Transcription feature (module/agent, steps, tools, API, Gemini/Whisper logic).
- Document designs in New Features section of the report.
- Design Extra Agents:
- Design Agent 1 (Purpose, Tools, Loop Sketch).
- Design Agent 2 (Purpose, Tools, Loop Sketch).
- Design Agent 3 (Purpose, Tools, Loop Sketch).
- Document designs in Extra Agents section of the report.
- Create Migration Plan:
- Define order of applying changes/features.
- List new dependencies for
requirements.txt. - Outline minimal unit/integration tests for validation.
- Document plan in Migration Plan section of the report.
- Assemble final report (
gaia_improvement_plan.md). - Ask user for confirmation/feedback on the plan before proceeding (as per user's "First action" instruction).